Share to: share facebook share twitter share wa share telegram print page

 

R. A. Headworks

Ramaswamy Aiyer Headworks

R. A. Headworks or Ramaswamy Aiyar Headworks is a masonry type weir situated in Munnar panchayath of Munnar village in Idukki district of Kerala, India impounding mudirapuzha river.[1] It is also called as Munnar Headworks. It is a part of Pallivasal Hydro Electric Project, the first hydro power project of Kerala State. There are two dams and one diversion weir as part of this project. These are Kundala Dam, Maduppetty Dam and R. A. Head works.

Ramaswamy Aiyer Headworks is located 15 km (9.3 mi) downstream of Maduppetty Dam near Munnar. The water stored in the Kundala reservoir is released through the stream to Maduppetty Dam located downstream. From the Maduppetty reservoir the water is released to downstream through a dam toe power house. The controlled release from Maduppetty Dam reaches the diversion weir named R.A. Head works [2] and from there, the water is diverted through a water conducting system to the power house of Pallivasal HEP located on the right bank of Mudirapuzha river. After generating power, the tail water is pumped to the balancing reservoir of Sengulam Hydro Electric Project and the surplus water from the sump of pumping station is spilled to the Mudirapuzha river itself.[3]

Specifications

The dam and its sluice canal
  • Latitude : 10⁰ 04’00” N N
  • Longitude: 77⁰ 04′ 00″ E
  • Panchayath : Munnar
  • Village : Munnar
  • District : Idukki
  • River Basin : Muthirapuzha
  • River:Muthirapuzha
  • Release from Dam to river : Muthirapuzha
  • Dam type  : Masonry
  • Classification : Weir
  • Maximum Water Level (MWL) : EL 1450.92 m
  • Full Reservoir Level ( FRL) : EL 1450.92 m
  • Storage at FRL : 0.223 Mm3
  • Height from deepest foundation : 10.90 m
  • Length : 39.62 m
  • Taluk through which release flows : Devikulam
  • Spillway : Vertical gate, 3 Nos. of size 11.60 x 6.70 m each
  • Year of completion : 1944 [4]
  • Crest LevelEL : 1439.02 m
  • Name of Project: Pallivasal HEP
  • River Outlet : Not provided
  • Purpose of Project: Hydro Power

References

  1. ^ "Emergency Action Plan (Tier- I) Kundala Dam, Maduppetty Dam& R A Head Works". Kerala State Electricity Board Ltd. March 2020. DOC No. KSEBL_EAP_07_KUNDALA_MADUPPETTY & RA Head Works_R2. Archived from the original on July 27, 2021.
  2. ^ JAMES, WILSON (13 August 2018). "Understanding the 42-year-old Idukki dam which is now saving Kerala".
  3. ^ "Diversion Structures in Idukki district – KSEB Limited Dam Safety Organisation". Retrieved 2021-07-27.
  4. ^ "കളറായി..." Mathrubhumi. Retrieved 2021-07-27.

Kembali kehalaman sebelumnya


Index: pl ar de en es fr it arz nl ja pt ceb sv uk vi war zh ru af ast az bg zh-min-nan bn be ca cs cy da et el eo eu fa gl ko hi hr id he ka la lv lt hu mk ms min no nn ce uz kk ro simple sk sl sr sh fi ta tt th tg azb tr ur zh-yue hy my ace als am an hyw ban bjn map-bms ba be-tarask bcl bpy bar bs br cv nv eml hif fo fy ga gd gu hak ha hsb io ig ilo ia ie os is jv kn ht ku ckb ky mrj lb lij li lmo mai mg ml zh-classical mr xmf mzn cdo mn nap new ne frr oc mhr or as pa pnb ps pms nds crh qu sa sah sco sq scn si sd szl su sw tl shn te bug vec vo wa wuu yi yo diq bat-smg zu lad kbd ang smn ab roa-rup frp arc gn av ay bh bi bo bxr cbk-zam co za dag ary se pdc dv dsb myv ext fur gv gag inh ki glk gan guw xal haw rw kbp pam csb kw km kv koi kg gom ks gcr lo lbe ltg lez nia ln jbo lg mt mi tw mwl mdf mnw nqo fj nah na nds-nl nrm nov om pi pag pap pfl pcd krc kaa ksh rm rue sm sat sc trv stq nso sn cu so srn kab roa-tara tet tpi to chr tum tk tyv udm ug vep fiu-vro vls wo xh zea ty ak bm ch ny ee ff got iu ik kl mad cr pih ami pwn pnt dz rmy rn sg st tn ss ti din chy ts kcg ve 
Prefix: a b c d e f g h i j k l m n o p q r s t u v w x y z 0 1 2 3 4 5 6 7 8 9