Share to: share facebook share twitter share wa share telegram print page

 

NSB El 3

NSB El 3
Type and origin
Power typeElectric
BuilderThune
Hamar Jernstøberi
Siemens
AEG
Build date1925 and 1929
Specifications
Configuration:
 • UIC(1′C)+(C1′)
Gauge1,435 mm (4 ft 8+12 in) standard gauge
Length21.1 m (69 ft 2+34 in) (double)
Loco weight138.3 tonnes
(136.1 long tons; 152.4 short tons)
Electric system/s15 kV 16.7 Hz Catenary
Current pickup(s)Pantograph
Performance figures
Maximum speed60 km/h (37 mph)
Career
OperatorsNorwegian State Railways
Number in class10
Numbers3 2025 – 3 2032
3 2047 – 3 2048
First run1925

NSB El 3 was an electric locomotive used by the Norwegian State Railways (NSB) to transport iron ore on the Ofoten Line. Five twin-locomotive sets were in service from 1925 to 1967.

History

The Swedish part of the ore line, the Iron Ore Line, was electrified in 1915 but Norway kept using steam locomotives until the Norwegian electrification in 1923. As Norwegian traction the El 3 was chosen along with five triple-engine El 4 units. Eight El 3 were built with delivery on August 9, 1925, two more on October 19, 1929. The El 3 and El 4 had about the same characteristics and used for the same purpose and ordered simultaneously; choosing two models like this is atypical for railway companies because of higher maintenance costs.

By 1922 SJ had placed an order on the new Of-locomotives, yet NSB chose to base the El 3 on the older Oe. Build by ASEA, they were equipped with quill drive and regenerative braking; the latter only caused problems though, excessively increasing the current that caused damage. They only served on the Norwegian lines until 1949, after which they were where put into through trains to Kiruna. In 1950 LKAB decided to increase the mine output, requiring trains now to haul 3,100 tonnes (3,051 long tons; 3,417 short tons). In 1953-54 the locomotives were rebuilt to three triple-engine sets and supplemented with eight El 12. When LKAB chose to increase train weights more in the late 1960s, NSB responded with the order of the El 15. All El 3 and El 4 units were taken out of service with the delivery in 1967, none being preserved.

Kembali kehalaman sebelumnya


Index: pl ar de en es fr it arz nl ja pt ceb sv uk vi war zh ru af ast az bg zh-min-nan bn be ca cs cy da et el eo eu fa gl ko hi hr id he ka la lv lt hu mk ms min no nn ce uz kk ro simple sk sl sr sh fi ta tt th tg azb tr ur zh-yue hy my ace als am an hyw ban bjn map-bms ba be-tarask bcl bpy bar bs br cv nv eml hif fo fy ga gd gu hak ha hsb io ig ilo ia ie os is jv kn ht ku ckb ky mrj lb lij li lmo mai mg ml zh-classical mr xmf mzn cdo mn nap new ne frr oc mhr or as pa pnb ps pms nds crh qu sa sah sco sq scn si sd szl su sw tl shn te bug vec vo wa wuu yi yo diq bat-smg zu lad kbd ang smn ab roa-rup frp arc gn av ay bh bi bo bxr cbk-zam co za dag ary se pdc dv dsb myv ext fur gv gag inh ki glk gan guw xal haw rw kbp pam csb kw km kv koi kg gom ks gcr lo lbe ltg lez nia ln jbo lg mt mi tw mwl mdf mnw nqo fj nah na nds-nl nrm nov om pi pag pap pfl pcd krc kaa ksh rm rue sm sat sc trv stq nso sn cu so srn kab roa-tara tet tpi to chr tum tk tyv udm ug vep fiu-vro vls wo xh zea ty ak bm ch ny ee ff got iu ik kl mad cr pih ami pwn pnt dz rmy rn sg st tn ss ti din chy ts kcg ve 
Prefix: a b c d e f g h i j k l m n o p q r s t u v w x y z 0 1 2 3 4 5 6 7 8 9