Share to: share facebook share twitter share wa share telegram print page

 

Magat River

Magat River
The river in Bambang, Nueva Vizcaya in 2020
Magat River is located in Luzon
Magat River
Magat River mouth
Magat River is located in Philippines
Magat River
Magat River (Philippines)
Native nameIlog ng Magat (Tagalog)
Location
CountryPhilippines
RegionCagayan Valley
Province
Physical characteristics
SourceConfluence of the Santa Fe and Marang Rivers
 • locationAritao, Nueva Vizcaya, Cordillera Central Mountains
MouthConfluence of Magat River-Cagayan River
 • location
Gamu, Isabela
 • coordinates
17°02′27″N 121°49′43″E / 17.040880°N 121.828583°E / 17.040880; 121.828583
 • elevation
26 ft (7.9 m)
Length226 km (140 mi)
Basin size5,200 km2 (2,000 sq mi)
Discharge 
 • locationCagayan River
 • average540 m3/s (19,000 cu ft/s)
Basin features
ProgressionMagat–Cagayan

The Magat River is a river in the Philippine island of Luzon with a total length of 226 kilometres (140 mi). It originates in the Nueva Vizcaya municipality of Aritao, where the Santa Fe River joins the Marang. It is the largest tributary of the Cagayan River by discharge volume of water, with an estimated drainage area of 5,200 square kilometres (2,000 sq mi), roughly twenty percent of the total drainage area of the Cagayan River.

Tributaries

The following are the tributaries of the Magat River by length:

  • Alimit River – 99.4 km (61.8 mi)
  • Matuno River – 84.7 km (52.6 mi)
  • Ibulao River – 78 km (48 mi)
  • Taotao River – 61.1 km (38.0 mi)
  • Santa Cruz River – 54.8 km (34.1 mi)
  • Padol River – 38.5 km (23.9 mi)
  • Lamut River – 38 km (24 mi)
  • Santa Fe River – 33.6 km (20.9 mi)
  • Benay River – 30.1 km (18.7 mi)
  • Marang River – 28.4 km (17.6 mi)
  • Manga River – 28.3 km (17.6 mi)
  • Balasig River – 21.4 km (13.3 mi)

Magat River Integrated Irrigation System

The Magat River Integrated Irrigation System Project, started by the National Irrigation Administration in the 1960s, is one of the Philippine's largest irrigation projects with hydroelectric power generation capacity. Its total cost amounted to US$500 million.[1]

The project is made up of the Magat reservoir, three diversion dams, a large number of irrigation canals and three pumping stations to supply irrigation water for an area of about 97,400 hectares (974 km2). It is also includes hydroelectric power plants; 360 megawatts (480,000 hp) at Magat reservoir, 6,000 kilowatts (8,000 hp) at Baligatan and 2,500 kilowatts (3,400 hp) Magat mini-hydroelectric power plants in Maris main canal.

See also

References

  1. ^ "Magat River". National Water Information Network. Archived from the original on October 5, 2011. Retrieved October 24, 2008.


Kembali kehalaman sebelumnya


Index: pl ar de en es fr it arz nl ja pt ceb sv uk vi war zh ru af ast az bg zh-min-nan bn be ca cs cy da et el eo eu fa gl ko hi hr id he ka la lv lt hu mk ms min no nn ce uz kk ro simple sk sl sr sh fi ta tt th tg azb tr ur zh-yue hy my ace als am an hyw ban bjn map-bms ba be-tarask bcl bpy bar bs br cv nv eml hif fo fy ga gd gu hak ha hsb io ig ilo ia ie os is jv kn ht ku ckb ky mrj lb lij li lmo mai mg ml zh-classical mr xmf mzn cdo mn nap new ne frr oc mhr or as pa pnb ps pms nds crh qu sa sah sco sq scn si sd szl su sw tl shn te bug vec vo wa wuu yi yo diq bat-smg zu lad kbd ang smn ab roa-rup frp arc gn av ay bh bi bo bxr cbk-zam co za dag ary se pdc dv dsb myv ext fur gv gag inh ki glk gan guw xal haw rw kbp pam csb kw km kv koi kg gom ks gcr lo lbe ltg lez nia ln jbo lg mt mi tw mwl mdf mnw nqo fj nah na nds-nl nrm nov om pi pag pap pfl pcd krc kaa ksh rm rue sm sat sc trv stq nso sn cu so srn kab roa-tara tet tpi to chr tum tk tyv udm ug vep fiu-vro vls wo xh zea ty ak bm ch ny ee ff got iu ik kl mad cr pih ami pwn pnt dz rmy rn sg st tn ss ti din chy ts kcg ve 
Prefix: a b c d e f g h i j k l m n o p q r s t u v w x y z 0 1 2 3 4 5 6 7 8 9