Kabwoya–Buhuka Road
The Kabwoya–Buhuka Road, also Kabwoya–Kyangwali Road, in the Western Region of Uganda, connects the town of Kabwoya, along the Kyenjojo–Hoima Road, to the town of Buhuka on the eastern shores of Lake Albert. The road is a critical "oil road" and is vital to the development of Uganda's nascent petroleum industry.[1] LocationBoth Kabwoya and Buhuka are located in the newly established Kikuube District, approximately 43 kilometres (27 mi) apart. The road travels from east to west through the village of Kusaru, Bugoma Forest Reserve, and the community of Kyangwali, which hosts the Kyangwali Refugee Settlement.[1][2] Upgrading to bitumenThe government of Uganda earmarked this road for upgrading through the conversion of the existing gravel road to class 2 bitumen surface and the building of bridges, shoulders, and drainage channels, with a lifespan of at least 20 years. China Railway Seventh Group (CRSG) was selected as the engineering, procurement and construction contractor under a design and build arrangement with the Ugandan government.[3] ConstructionThe contract price for the upgrade is reported to be USh:263 billion (approx. US$71.2 million). Construction began in September 2024 and is expected to last 36 months. The project is funded by the Government of Uganda.[3] Other considerationThe adjoining Bukuha-Kingfisher Road, measuring approximately 5 kilometres (3 mi)[4] was upgraded to class 2 bitumen surface earlier by China National Offshore Oil Corporation (CNOOC), to improve accessibility to the Kingfisher oil fields.[1] See also
References
External links
|