Share to: share facebook share twitter share wa share telegram print page

 

Hurlstone Park railway station

Hurlstone Park
Eastbound view from Platform 2, August 2024
General information
LocationFloss Street, Hurlstone Park
Australia
Coordinates33°54′38″S 151°07′55″E / 33.9105°S 151.1319°E / -33.9105; 151.1319
Elevation23 metres (75 ft)
Owned byTransport Asset Holding Entity
Operated byMetro Trains Sydney (from 2025)
Line(s)Bankstown
Distance8.80 kilometres (5.47 mi) from Central
Platforms2 side
Tracks4
Connections Bus
Construction
Structure typeGround
AccessibleYes
Other information
Status
  • Weekdays:

Staffed: 6am to 7pm

  • Weekends and public holidays:
Unstaffed
Station codeHPK
WebsiteTransport for NSW
History
Opened1 February 1895
Closed30 September 2024
ElectrifiedYes
Previous namesFern Hill (1895–1911)
Passengers
2023[2]
  • 562,020 (year)
  • 1,540 (daily)[1] (Sydney Trains, NSW TrainLink)
Services
Preceding station Sydney Metro Following station
Future services
Canterbury
towards Bankstown
Metro North West & Bankstown Line Dulwich Hill
towards Tallawong
Former services
Preceding station Sydney Trains Following station
Canterbury
towards Lidcombe or Liverpool
Bankstown Line (until 2024) Dulwich Hill
towards City Circle

Hurlstone Park railway station is a heritage-listed railway station located on the Bankstown line, serving the Sydney suburb of Hurlstone Park.

Station entrance on Floss Street

History

Hurlstone Park station opened on 1 February 1895 as Fern Hill when the Bankstown line opened from Sydenham to Belmore. It was renamed Hurlstone Park on 19 August 1911.[3][4]

To the north of the station, lie two tracks that are part of the Metropolitan Goods line. The westbound line has a platform face, this was taken out of use when the Metropolitan Goods line was built in 1915.[4]

The station was upgraded and received lifts and tactile indicators in 2023 in preparation for the line’s conversion to Sydney Metro in 2025 which commenced on 30 September 2024.

Platforms and services

Platform Line Stopping pattern Notes
1 services to Tallawong (from 2025)
2 services to Bankstown (from 2025)

Transit Systems operates two bus routes via Hurlstone Park station, under contract to Transport for NSW:

References

  1. ^ This figure is the number of entries and exits of a year combined averaged to a day.
  2. ^ "Train Station Monthly Usage". Open Data. Retrieved 26 January 2024.
  3. ^ Hurlstone Park Station NSWrail.net
  4. ^ a b Hurlstone Park Railway Station Group NSW Environment & Heritage
  5. ^ "Transit Systems route 406". Transport for NSW.
  6. ^ "Transit Systems route 418". Transport for NSW.
Kembali kehalaman sebelumnya


Index: pl ar de en es fr it arz nl ja pt ceb sv uk vi war zh ru af ast az bg zh-min-nan bn be ca cs cy da et el eo eu fa gl ko hi hr id he ka la lv lt hu mk ms min no nn ce uz kk ro simple sk sl sr sh fi ta tt th tg azb tr ur zh-yue hy my ace als am an hyw ban bjn map-bms ba be-tarask bcl bpy bar bs br cv nv eml hif fo fy ga gd gu hak ha hsb io ig ilo ia ie os is jv kn ht ku ckb ky mrj lb lij li lmo mai mg ml zh-classical mr xmf mzn cdo mn nap new ne frr oc mhr or as pa pnb ps pms nds crh qu sa sah sco sq scn si sd szl su sw tl shn te bug vec vo wa wuu yi yo diq bat-smg zu lad kbd ang smn ab roa-rup frp arc gn av ay bh bi bo bxr cbk-zam co za dag ary se pdc dv dsb myv ext fur gv gag inh ki glk gan guw xal haw rw kbp pam csb kw km kv koi kg gom ks gcr lo lbe ltg lez nia ln jbo lg mt mi tw mwl mdf mnw nqo fj nah na nds-nl nrm nov om pi pag pap pfl pcd krc kaa ksh rm rue sm sat sc trv stq nso sn cu so srn kab roa-tara tet tpi to chr tum tk tyv udm ug vep fiu-vro vls wo xh zea ty ak bm ch ny ee ff got iu ik kl mad cr pih ami pwn pnt dz rmy rn sg st tn ss ti din chy ts kcg ve 
Prefix: a b c d e f g h i j k l m n o p q r s t u v w x y z 0 1 2 3 4 5 6 7 8 9