Share to: share facebook share twitter share wa share telegram print page

 

BBL Pipeline

Balgzand Bacton Line
Map
Location of Balgzand Bacton Line
Location
CountryNetherlands, United Kingdom
Coordinates52°53′20″N 3°05′43″E / 52.8890°N 3.0954°E / 52.8890; 3.0954
General directioneast–west
FromBalgzand Gas Plant, Anna Paulowna, Netherlands
Passes throughNorth Sea
ToBacton Gas Terminal, United Kingdom
General information
Typenatural gas
PartnersGasunie, Uniper, Fluxys
OperatorBBL Company
Commissioned2006
Technical information
Length235 km (146 mi)
Maximum discharge19 billion cubic metres per year
Diameter36 in (914 mm)
No. of compressor stations1
Compressor stationsAnna Paulowna

The BBL Pipeline (Balgzand Bacton Line, BBL) is a natural gas interconnector between the Netherlands and the United Kingdom.

History

Laying the pipeline between the compressor station at the Balgzand Gas Plant at Grasweg in Anna Paulowna (province of North Holland) and Bacton Gas Terminal started on 14 July 2006. The pipeline became operational on 1 December 2006.

Technical description

The overall length of pipeline is 235 kilometres (146 mi) of which around 230 kilometres (140 mi) is offshore. The pipeline's diameter is 36 inches (910 mm) and working pressure is 135 standard atmospheres (13,700 kPa). The initial capacity is 16 billion cubic meters (bcm) per year, which will be increased to 19.2 bcm by the end of 2010 by installing a fourth compressor at the compressor station at Anna Paulowna.[1] The pipeline has a regulatory exemption from the two-ways gas flow until October 2018. Until this, the direction of gas flow is from the Netherlands to the UK.[2] The overall cost of the project was around 500 million.

Operating company

The BBL was developed and operated by the BBL Company. The main shareholder of the company is Gasunie with 60% of the shares, and Enagas and Fluxys both own 20%. Russian Gazprom had an option for 9%, in exchange for a 9% share of Nord Stream AG.[3] The BBL Pipeline would allow Gazprom to supply additional gas to the British market through the Nord Stream 1 pipeline.

See also

References

  1. ^ "BBL pumps up the volume". Upstream Online. NHST Media Group. 19 August 2008. Retrieved 19 August 2008.
  2. ^ Adomaitis, Nerijus (6 October 2016). "UK extends BBL pipeline's exemption from two way gas flows". Reuters. Archived from the original on 23 October 2016. Retrieved 23 October 2016.
  3. ^ "Gazprom and Gasunie sign agreement on cooperation within Nord Stream and BBL projects" (Press release). Gazprom. 6 November 2007. Archived from the original on 4 March 2008. Retrieved 6 November 2007.
Kembali kehalaman sebelumnya


Index: pl ar de en es fr it arz nl ja pt ceb sv uk vi war zh ru af ast az bg zh-min-nan bn be ca cs cy da et el eo eu fa gl ko hi hr id he ka la lv lt hu mk ms min no nn ce uz kk ro simple sk sl sr sh fi ta tt th tg azb tr ur zh-yue hy my ace als am an hyw ban bjn map-bms ba be-tarask bcl bpy bar bs br cv nv eml hif fo fy ga gd gu hak ha hsb io ig ilo ia ie os is jv kn ht ku ckb ky mrj lb lij li lmo mai mg ml zh-classical mr xmf mzn cdo mn nap new ne frr oc mhr or as pa pnb ps pms nds crh qu sa sah sco sq scn si sd szl su sw tl shn te bug vec vo wa wuu yi yo diq bat-smg zu lad kbd ang smn ab roa-rup frp arc gn av ay bh bi bo bxr cbk-zam co za dag ary se pdc dv dsb myv ext fur gv gag inh ki glk gan guw xal haw rw kbp pam csb kw km kv koi kg gom ks gcr lo lbe ltg lez nia ln jbo lg mt mi tw mwl mdf mnw nqo fj nah na nds-nl nrm nov om pi pag pap pfl pcd krc kaa ksh rm rue sm sat sc trv stq nso sn cu so srn kab roa-tara tet tpi to chr tum tk tyv udm ug vep fiu-vro vls wo xh zea ty ak bm ch ny ee ff got iu ik kl mad cr pih ami pwn pnt dz rmy rn sg st tn ss ti din chy ts kcg ve 
Prefix: a b c d e f g h i j k l m n o p q r s t u v w x y z 0 1 2 3 4 5 6 7 8 9