Share to: share facebook share twitter share wa share telegram print page

 

16 Avenue N station

16 Avenue N
CTrain station
General information
Coordinates51°04′00″N 114°03′45″W / 51.066748°N 114.062498°W / 51.066748; -114.062498
Owned byCalgary Transit
Line(s)Green Line (Calgary)
PlatformsCentre loading platform
Tracks2
ConnectionsMAX Orange
300 North BRT / Airport
301 North BRT / North Pointe
Airdrie Transit Intercity Express
Construction
Structure typeAt grade
ParkingNone
AccessibleYes
Other information
Fare zoneFare paid
History
Opening2027 (2027)
ElectrifiedOverhead catenary
Services
Preceding station CTrain Following station
Terminus Green Line
(phase 2)
9 Avenue N
toward Shepard

16 Avenue N station is a planned CTrain light rail station in Calgary, Alberta, part of the Green Line Phase 2. On June 16, 2020, Calgary City Council approved the alignment of Green Line Stage 1, Phase 1 and 2, running between this station and Shepard station.[1] As of July, 2024, a decision of building Phase 2 has not been made.[2] The station serves as the northern terminus station for stage one of construction and is expected to be one of the busiest stations on opening day.[3] It will serve as a transfer point between the Green Line and MAX Orange BRT, connecting riders to the city's northwest, northeast, the Southern Alberta Institute of Technology, the University of Calgary, the Foothills Medical Centre, the Alberta Children's Hospital and future Calgary Cancer Centre.

The station will be directly south of 16 Avenue North in the community of Crescent Heights. It is planned to be a low-profile urban station with curb height platforms, at-grade boarding, and will be in the median of Centre Street. The station will not include a park and ride. The area surrounding the station is instead expected to be redeveloped with high-density transit oriented development.[4] As of 2015, there were 6,250 residents and 3,250 jobs within walking distance of the station. That number is expected to increase to 13,400 residents and 5,050 jobs after the station opens for service in 2027.[5]

The station was planned as an underground station in the city's 2017 recommendations, but was modified to an at-grade station with the city's 2020 alignment update.[6]

References

  1. ^ "Council approves Green Line program". Retrieved 2024-07-12.
  2. ^ "Green Line Future Extensions". Retrieved 2024-07-12.
  3. ^ Transportation. "16 Avenue N. Green Line Station". www.calgary.ca. Retrieved 2020-07-21.
  4. ^ "Long-term vision for the 16 Avenue N Station" (PDF).[permanent dead link]
  5. ^ "Green Line Long Term Vision Report Part 2" (PDF). Archived (PDF) from the original on 2020-10-31.
  6. ^ Communications, Customer Service &. "Green Line - Segment 2 | Green Line Stage One". Engage. Retrieved 2021-04-11.
Kembali kehalaman sebelumnya


Index: pl ar de en es fr it arz nl ja pt ceb sv uk vi war zh ru af ast az bg zh-min-nan bn be ca cs cy da et el eo eu fa gl ko hi hr id he ka la lv lt hu mk ms min no nn ce uz kk ro simple sk sl sr sh fi ta tt th tg azb tr ur zh-yue hy my ace als am an hyw ban bjn map-bms ba be-tarask bcl bpy bar bs br cv nv eml hif fo fy ga gd gu hak ha hsb io ig ilo ia ie os is jv kn ht ku ckb ky mrj lb lij li lmo mai mg ml zh-classical mr xmf mzn cdo mn nap new ne frr oc mhr or as pa pnb ps pms nds crh qu sa sah sco sq scn si sd szl su sw tl shn te bug vec vo wa wuu yi yo diq bat-smg zu lad kbd ang smn ab roa-rup frp arc gn av ay bh bi bo bxr cbk-zam co za dag ary se pdc dv dsb myv ext fur gv gag inh ki glk gan guw xal haw rw kbp pam csb kw km kv koi kg gom ks gcr lo lbe ltg lez nia ln jbo lg mt mi tw mwl mdf mnw nqo fj nah na nds-nl nrm nov om pi pag pap pfl pcd krc kaa ksh rm rue sm sat sc trv stq nso sn cu so srn kab roa-tara tet tpi to chr tum tk tyv udm ug vep fiu-vro vls wo xh zea ty ak bm ch ny ee ff got iu ik kl mad cr pih ami pwn pnt dz rmy rn sg st tn ss ti din chy ts kcg ve 
Prefix: a b c d e f g h i j k l m n o p q r s t u v w x y z 0 1 2 3 4 5 6 7 8 9