User:RipeTripe101/Ceres Project
| This is not a Wikipedia article: It is an individual user's work-in-progress page, and may be incomplete and/or unreliable. For guidance on developing this draft, see Help:Userspace draft § Creation. Find sources: Google (books · news · scholar · free images · WP refs) · FENS · JSTOR · TWL |
| Ceres Project | |
|---|---|
![]() | |
| Country | Australia |
| Location | York Peninsula |
| Coordinates | 34°39′11″S 137°47′31″E / 34.65306°S 137.79194°E |
| Status | Under Construction |
| Construction cost | 1.6 Billion AUD |
| Owner | Senvion |
| Wind farm | |
| Type | Onshore |
| Hub height | 140 metres (459 ft) |
| Rotor diameter | 160 metres (525 ft) |
| Site area | ~18,000 hectares (180 km2) |
| Power generation | |
| Nameplate capacity | 600 MW |
| External links | |
| Website | http://www.theceresproject.com.au |
The Ceres Project is a wind farm under construction on the York Peninsula, in South Australia. The project includes approximately 600 MW of wind turbine generational capacity, as well as a high-voltage direct current (HVDC) transmission line to Adelaide, under Gulf St Vincent, comprising of two 300 MW connections (74 km of marine and terrestrial cable)[1].
Category:Wind farms in South Australia Category:Proposed renewable energy power stations in Australia The application for the project was initially submitted to the state government in the third quarter of 2012[1], and was approved on the 10th of February, 2014[2]. A revised application was submitted to the regulator in 2017, with minor amendments "to allow the utilisation of the most modern wind turbine technology"[3], increasing the maximum tip height to 220 metres, an increase in the maximum rotor diameter to 160 metres, a reduction in the total number of turbines (from 187 to 170, based on increases in the efficiency of turbine technology), and a capping of the output (at 630 MW)[4]. The revised plan was approved by the department on the 9th of April, 2018[5].
References
- ^ a b "Senvion – Ceres Wind Farm 600 MW – South Australia - Project Profile". www.marketresearch.com. Retrieved 2021-09-12.
- ^ "Decision Notification Form for Crown Development and Public Infrastructure 544/V001/13" (PDF). Department of Planning Transport and Infrastructure. 10 February 2014. Retrieved 12 September 2021.
{{cite web}}: CS1 maint: url-status (link) - ^ "Development Approval | Ceres Project". www.theceresproject.com.au. Retrieved 2021-09-12.
- ^ "The Ceres Project Update" (PDF). The Ceres Project. August 2019. Retrieved 12 September 2021.
{{cite web}}: CS1 maint: url-status (link) - ^ "DECISION NOTIFICATION FORM CROWN DEVELOPMENT AND PUBLIC INFRASTRUCTURE (544/V001/13 V2)" (PDF). Department of Planning Transport and Infrastructure. 9 April 2018. Retrieved 12 September 2021.
{{cite web}}: CS1 maint: url-status (link)
External Links
Further Reading
Content Disclaimer
Informasi ini disarikan dari Wikipedia dan disajikan kembali untuk tujuan edukasi. Konten tersedia di bawah lisensi CC BY-SA 3.0. Kami tidak bertanggung jawab atas ketidakakuratan data yang bersumber dari kontribusi publik tersebut.
- The information displayed on this website is sourced in part or in whole from Wikipedia and has been adapted for the purpose of restating it. We strive to provide accurate and relevant information, however:
- There is no guarantee of absolute accuracy. Wikipedia is an open, collaborative project that can be edited by anyone, so information is subject to change.
- It is not intended to constitute professional advice. The content displayed is for informational and educational purposes only. For important decisions (e.g., medical, legal, or financial), please consult a professional.
- Content copyright. Wikipedia is licensed under the Creative Commons Attribution-ShareAlike License (CC BY-SA). This means that content may be reused with appropriate attribution and shared under a similar license.
- Responsible use. Any risk arising from the use of information from this website is entirely the responsibility of the user.