Load rejection
Load rejection in an electric power system is the condition in which there is a sudden load loss in the system which causes the generating equipment to be over-frequency.
A load rejection test is part of commissioning for power systems to confirm that the system can withstand a sudden loss of load and return to normal operating conditions using its governor.[1] Load banks are normally used for these tests.
See also
References
- ^ "ASME DC | Journal of Engineering for Gas Turbines and Power | Load Rejection Tests and Their Dynamic Simulations With a 150 kW Class Microsteam Turbine". Gasturbinespower.asmedigitalcollection.asme.org. Retrieved 2014-04-21.
Content Disclaimer
Informasi ini disarikan dari Wikipedia dan disajikan kembali untuk tujuan edukasi. Konten tersedia di bawah lisensi CC BY-SA 3.0. Kami tidak bertanggung jawab atas ketidakakuratan data yang bersumber dari kontribusi publik tersebut.
- The information displayed on this website is sourced in part or in whole from Wikipedia and has been adapted for the purpose of restating it. We strive to provide accurate and relevant information, however:
- There is no guarantee of absolute accuracy. Wikipedia is an open, collaborative project that can be edited by anyone, so information is subject to change.
- It is not intended to constitute professional advice. The content displayed is for informational and educational purposes only. For important decisions (e.g., medical, legal, or financial), please consult a professional.
- Content copyright. Wikipedia is licensed under the Creative Commons Attribution-ShareAlike License (CC BY-SA). This means that content may be reused with appropriate attribution and shared under a similar license.
- Responsible use. Any risk arising from the use of information from this website is entirely the responsibility of the user.