Kpalassi Solar Power Station
| Kpalassi Solar Power Station | |
|---|---|
![]() | |
| Country | Togo |
| Location | Kpalassi, near Awandjelo, Assoli Prefecture, Kara Region |
| Coordinates | 09°24′50″N 01°13′33″E / 9.41389°N 1.22583°E |
| Status | Proposed |
| Operator | Kpalassi Solar Company |
| Solar farm | |
| Type | Flat-panel PV |
| Power generation | |
| Nameplate capacity | 42 megawatts (56,000 hp) |
Kpalassi Solar Power Station (also Awandjélo Solar Power Station) is a 42 megawatts (56,000 hp) solar power plant, under development in Togo. The power station is being developed by the government of Togo, through the Agence Togolaise d’Electrification Rurale et des Energies Renouvelables (AT2ER) (Togolese Agency for Rural Electrification and Renewable Energy), with loans from the World Bank Group and from the West African Development Bank, under the Scaling Solar program.[1][2]
Location
The power station would be located in Kpalassi Village, near the town of Awandjélo, in the Assoli Prefecture of the Kara Region, in the north of Togo. Awandjélo is located approximately 12.5 kilometres (8 mi) south of Kara, the provincial capital.[3] This is about 400 kilometres (249 mi) north of Lomé, the national capital and largest city of Togo.[4]
Overview
The International Finance Corporation (IFC), the "private window" of the World Bank Group, has a program called "Scaling Solar", which encourages and provides financing to sub-Saharan African countries to diversify energy sources by setting up solar generation stations, either by themselves or in public private partnerships (PPPs) with independent power producers (IPPs). Togo signed up for the Scaling Solar mechanism in 2019. This is one of the first three solar farms under that arrangement. The design calls for a capacity of 42 megawatts.[5]
Developers
The IPP for this power station was still in the tender stage, as of June 2022.[2]
Financing
As of July 2022, the West African Development Bank had committed to lend €38 million towards the construction of this power station.[1]
See also
References
- ^ a b Jean Marie Takouleu (17 June 2022). "Togo: BOAD commits €38m for the 42 MWp Awandjélo solar power plant". Afrik21.africa. Paris, France. Retrieved 19 June 2022.
- ^ a b Peark10 Organization (20 December 2019). "Togo Launches 60-80MW Scaling Solar Tender". Peak10.Org. Washington DC, United States. Retrieved 19 June 2022.
{{cite web}}: CS1 maint: numeric names: authors list (link) - ^ "Road Distance Between Awandjelo, Togo And Kara, Togo" (Map). Google Maps. Retrieved 19 June 2022.
- ^ "Road Distance Between Awandjelo, Togo And Lomé, Togo" (Map). Google Maps. Retrieved 19 June 2022.
- ^ Fiacre E. Kakpo (15 June 2022). "BOAD to pump CFA25 billion into the construction of a solar PV plant in Awandjelo, northern Togo". Togofirst.com. Lome, Togo. Retrieved 19 June 2022.
External links
- Togo seeks investors to build two new 60 to 80 MW solar power plants as of 13 January 2020
Content Disclaimer
Informasi ini disarikan dari Wikipedia dan disajikan kembali untuk tujuan edukasi. Konten tersedia di bawah lisensi CC BY-SA 3.0. Kami tidak bertanggung jawab atas ketidakakuratan data yang bersumber dari kontribusi publik tersebut.
- The information displayed on this website is sourced in part or in whole from Wikipedia and has been adapted for the purpose of restating it. We strive to provide accurate and relevant information, however:
- There is no guarantee of absolute accuracy. Wikipedia is an open, collaborative project that can be edited by anyone, so information is subject to change.
- It is not intended to constitute professional advice. The content displayed is for informational and educational purposes only. For important decisions (e.g., medical, legal, or financial), please consult a professional.
- Content copyright. Wikipedia is licensed under the Creative Commons Attribution-ShareAlike License (CC BY-SA). This means that content may be reused with appropriate attribution and shared under a similar license.
- Responsible use. Any risk arising from the use of information from this website is entirely the responsibility of the user.
