Illinois Subdivision
The Illinois Subdivision is a railroad line owned and operated by CSX Transportation in the U.S. states of Indiana and Illinois. The line runs from Washington, Indiana, west to East St. Louis, Illinois,[1] along a former Baltimore and Ohio Railroad line.
At its east end, the Illinois Subdivision becomes the Indiana Subdivision. At its west end in East St. Louis, near the west end of the St. Louis Line Subdivision, it meets the Terminal Railroad Association of St. Louis. Along the way, the line intersects the CE&D Subdivision at Vincennes, Indiana.[2][3]
History
The line, built by the Ohio and Mississippi Railroad, was completed in 1857.[4] It passed to the Baltimore and Ohio Railroad and CSX via leases and mergers.
In the 2000s, traffic slowly started to fall due to declining customers and CSX acquiring Conrail's St. Louis line which ran parallel to the Illinois Subdivision. CSX began to reroute the remaining trains onto the St. Louis line since it could handle more traffic. By 2015, only 4 trains still used the Illinois Subdivision before the last trains ran through in July 2015.
In the summer of 2015, the Illinois Subdivision line was cut in Caseyville, Illinois, and just west of Flora, Illinois. This marked the temporary closure of the line from Flora west.[5] A plastic manufacturer and three grain buyers in Richland and Lawrence counties continue to have access to the line with trains from the east. In April 2017, the line west of Flora was briefly reopened for railcar storage. CSX initially planned to store more cars but due to the Illinois Commerce Commission requesting that they replace most of the crossings which were inactive and had their gates removed after it was initially taken OOS, they only ran one storage train. After other complaints they removed the cars stored between Aviston, Illinois and Shattuc, Illinois in 2019. (Update 11/6/25) It marks over 10 years since the Illinois Subdivision's shut down from Flora, Illinois and to O'Fallon, Illinois. The future of this once action packed line is now facing an uncertain fate. As CSX Transportation has no plans to reactivate or to even have any future plans on this line. Since 2021 sidings have been ripped out and diamonds in Odin, Illinois and Shattuc remain cut.
External links
References
- ^ CSX Timetables: Illinois Subdivision
- ^ "IL-Illinois Sub - the RadioReference Wiki".
- ^ http://www.multimodalways.org/docs/railroads/companies/CSX/CSX%20ETTs/CSX%20Louisville%20Div%20ETT%20%233%201-1-2005.pdf CSX Louisville Division Timetable
- ^ "PRR Chronology, 1857" (PDF). (54.1 KiB), March 2005 Edition
- ^ Buss, Will (August 14, 2015). "'Looks strange': Railroad temporarily cuts its service". Belleville News-Democrat. Retrieved April 28, 2020.
Content Disclaimer
Informasi ini disarikan dari Wikipedia dan disajikan kembali untuk tujuan edukasi. Konten tersedia di bawah lisensi CC BY-SA 3.0. Kami tidak bertanggung jawab atas ketidakakuratan data yang bersumber dari kontribusi publik tersebut.
- The information displayed on this website is sourced in part or in whole from Wikipedia and has been adapted for the purpose of restating it. We strive to provide accurate and relevant information, however:
- There is no guarantee of absolute accuracy. Wikipedia is an open, collaborative project that can be edited by anyone, so information is subject to change.
- It is not intended to constitute professional advice. The content displayed is for informational and educational purposes only. For important decisions (e.g., medical, legal, or financial), please consult a professional.
- Content copyright. Wikipedia is licensed under the Creative Commons Attribution-ShareAlike License (CC BY-SA). This means that content may be reused with appropriate attribution and shared under a similar license.
- Responsible use. Any risk arising from the use of information from this website is entirely the responsibility of the user.