Direct costs

Direct costs, in accounting, are costs directly accountable to a cost object (such as a particular project, facility, function, or product).[1] The equivalent nomenclature in economics is specific cost.[1] Direct costs may be either fixed or variable, but typically comprise materials, labour, and specific expenses such as a royalty payment to a patent holder for a given production process,[2] all directly attributable to a cost object. Thus by industry:

  • In construction, the costs of materials, labor, equipment, etc., and all directly involved efforts or expenses for the cost object are direct costs.
  • In manufacturing or other non-construction industries, the portion of operating costs that is directly assignable to a specific product or process is a direct cost.[3]
  • In project management, direct costs are those for activities or services that benefit specific projects, for example salaries for project staff and materials required for a particular project. Because these activities are easily traced to projects, their costs are usually charged to projects on an item-by-item basis.

By contrast, indirect costs are costs not directly accountable to a cost object (such as a particular project, facility, function or product). These include administration, personnel and security costs.

A joint cost is a cost incurred in the production or delivery of multiple products or product lines. For instance, in civil aviation, substantial costs of a flight (pilots, fuel, wear and tear on the plane, landing and takeoff fees) are a joint cost between carrying passengers and carrying freight, and underlie economies of scope across passenger and freight services. By contrast, some costs are specific to the services, for instance, meals and flight attendants are specific costs of carrying passengers.

"Other direct costs" (ODC) are costs attributable to a specific project or contract, excluding labor and materials.[4]

References

  1. ^ a b "What Are Direct Costs? Definition, Examples, and Types". Investopedia. Retrieved 2021-11-09.
  2. ^ CIPS (2016), Procurement and supply workflow, published by Profex Publishing Ltd., p. 49
  3. ^ Standard AACE International Recommended Practice No. 10S-90 COST ENGINEERING TERMINOLOGY TCM Framework: General Reference, Association for the Advancement of Cost Engineering International, 2010, Pg 35
  4. ^ GovGPT, What are Other Direct Costs in Government Contracting?, accessed on 22 November 2025


Content Disclaimer

Informasi ini disarikan dari Wikipedia dan disajikan kembali untuk tujuan edukasi. Konten tersedia di bawah lisensi CC BY-SA 3.0. Kami tidak bertanggung jawab atas ketidakakuratan data yang bersumber dari kontribusi publik tersebut.

  1. The information displayed on this website is sourced in part or in whole from Wikipedia and has been adapted for the purpose of restating it. We strive to provide accurate and relevant information, however:
  2. There is no guarantee of absolute accuracy. Wikipedia is an open, collaborative project that can be edited by anyone, so information is subject to change.
  3. It is not intended to constitute professional advice. The content displayed is for informational and educational purposes only. For important decisions (e.g., medical, legal, or financial), please consult a professional.
  4. Content copyright. Wikipedia is licensed under the Creative Commons Attribution-ShareAlike License (CC BY-SA). This means that content may be reused with appropriate attribution and shared under a similar license.
  5. Responsible use. Any risk arising from the use of information from this website is entirely the responsibility of the user.