Share to: share facebook share twitter share wa share telegram print page

 

47th–50th Streets–Rockefeller Center station

 47–50 Streets–Rockefeller Center
 "B" train"D" train"F" train"F" express train"M" train
New York City Subway station (rapid transit)
View from the southbound platform of the 47th–50th Streets–Rockefeller Center station. There is a yellow tactile strip on the platform's edge. The southbound local and northbound express tracks are separated by a set of columns. In the background is the northbound local track, adjacent to a white tiled wall with a red-tile band.
View from southbound platform
Station statistics
AddressSixth Avenue between West 47th Street & West 50th Street
New York, New York
BoroughManhattan
LocaleMidtown Manhattan
Coordinates40°45′31″N 73°58′53″W / 40.758603°N 73.981376°W / 40.758603; -73.981376
DivisionB (IND)[1]
Line   IND Sixth Avenue Line
Services   B weekdays during the day (weekdays during the day)
   D all times (all times)
   F all times (all times) <F> two rush hour trains, peak direction (two rush hour trains, peak direction)
   M weekdays during the day (weekdays during the day)
TransitBus transport NYCT Bus: M5, M7, M50
StructureUnderground
Platforms2 island platforms
cross-platform interchange
Tracks4
Other information
OpenedDecember 15, 1940; 83 years ago (1940-12-15)
AccessibleThis station is compliant with the Americans with Disabilities Act of 1990 ADA-accessible
Opposite-
direction
transfer
Yes
Traffic
202311,387,612[2]Increase 16.4%
Rank13 out of 423[2]
Services
Preceding station New York City Subway New York City Subway Following station
Seventh Avenue
B Weekday rush hours, middays and early eveningsD all times

Express
42nd Street–Bryant Park
B weekdays during the dayD all timesF all times <F> two rush hour trains, peak directionM weekdays during the day
57th Street
F all times <F> two rush hour trains, peak direction

Local
Fifth Avenue/53rd Street
M weekdays during the day

Local
Location
47th–50th Streets–Rockefeller Center station is located in New York City Subway
47th–50th Streets–Rockefeller Center station
47th–50th Streets–Rockefeller Center station is located in New York City
47th–50th Streets–Rockefeller Center station
47th–50th Streets–Rockefeller Center station is located in New York
47th–50th Streets–Rockefeller Center station
Track layout

Street map

Map

Station service legend
Symbol Description
Stops all times Stops all times
Stops all times except late nights Stops all times except late nights
Stops weekdays during the day Stops weekdays during the day
Stops rush hours in the peak direction only (limited service) Stops rush hours in the peak direction only (limited service)

The 47th–50th Streets–Rockefeller Center station (formerly 47th Street–50th Street–Rockefeller Center) is an express station on the IND Sixth Avenue Line of the New York City Subway. It is located along Sixth Avenue (Avenue of the Americas) between 47th and 50th Streets, on the west side of Rockefeller Center. The station is served by the D and F trains at all times, the B and M trains on weekdays, and the <F> train during rush hours in the peak direction. In 2019, it was the 12th busiest subway station in the system.

The Rockefeller Center station was built for the Independent Subway System (IND), which had first proposed constructing a line under Sixth Avenue in 1924. The line's construction was delayed by a decade due to negotiations with the Hudson & Manhattan Railroad. A contract for the line segment that includes the Rockefeller Center station was awarded in 1936. The station opened on December 15, 1940, and its mezzanine was expanded in the late 1950s and the early 1970s. The New York City Transit Authority proposed renovating the Rockefeller Center station in the 1990s, but the station still has not been renovated as of 2024.

The 47th–50th Streets–Rockefeller Center station contains two island platforms and four tracks. The northbound platform has the traditional arrangement of local service on the outside track and express service on the inside track, but the southbound platform reverses this (local on the inside, express on the outside). There is a full mezzanine above the station, connecting with Rockefeller Center. The station contains elevators, which make the station compliant with the Americans with Disabilities Act of 1990. The tracks diverge to the Eighth Avenue, 53rd Street, and 63rd Street lines to the north, and the southbound tracks cross over each other to the south.

History

Construction

New York City mayor John Francis Hylan's original plans for the Independent Subway System (IND), proposed in 1922, included building over 100 miles (160 km) of new lines and taking over nearly 100 miles (160 km) of existing lines. The lines were designed to compete with the existing underground, surface, and elevated lines operated by the Interborough Rapid Transit Company (IRT) and Brooklyn–Manhattan Transit Corporation (BMT).[3][4] The IND Sixth Avenue Line was designed to replace the elevated IRT Sixth Avenue Line.[5] In 1924, the IND submitted its list of proposed subway routes to the New York City Board of Transportation (BOT), which approved the program. One of the routes was a segment of tunnel from Fourth Street to 53rd Street.[6] Part of this stretch was already occupied by the Hudson & Manhattan Railroad (H&M)'s Uptown Hudson Tubes.[7] As a result, negotiations between the city and the H&M continued for several years.[8] The IND and H&M finally came to an agreement in 1930. The city had decided to build the IND Sixth Avenue Line's local tracks around the pre-existing H&M tubes, and add express tracks for the IND underneath the H&M tubes at a later date.[5] Also in 1930, the BOT identified the locations of 104 stations to be built in the IND system. Under this plan, there would have been an express station at Sixth Avenue and 50th Street.[9]

The IND started advertising bids for the section of the Sixth Avenue Line between 43rd and 53rd Streets in April 1931.[10] In April 1935, engineers started planning in earnest for the Midtown portion of the Sixth Avenue Line.[11] The city government issued corporate stock to pay for the $53 million cost of the project, since the line was not eligible for federal Public Works Administration funds.[12][13] The first contract, for the section between 40th and 47th Streets (just south of the Rockefeller Center station), was awarded to Rosoff-Brader Construction in October 1935.[14][15] Mayor Fiorello H. La Guardia broke ground for the Sixth Avenue subway at Bryant Park on March 23, 1936.[16][17] As part of the first phase of the project, the contractors built a compressor plant and a shaft at 46th Street.[18] In November 1936, the George A. Flynn Corporation received a $4,616,476 contract for the construction of the section between 47th and 53rd Streets.[19]

The line was built as a four-track tunnel north of 33rd Street (including the Rockefeller Center station), but there were only two tracks south of that street. The work largely involved cut-and-cover excavations, although portions of the subway had to be tunneled through solid rock.[20] The builders also had to avoid disrupting the Sixth Avenue elevated or the various utility lines on the avenue,[21] and some of the utility pipes and wires under Sixth Avenue had to be replaced in the process.[22] Excavation work was conducted 24 hours a day, with most of the blasting work being conducted at night.[20][23] Workers used small charges of dynamite to avoid damaging nearby buildings or the Catskill Aqueduct, which ran below Sixth Avenue and was a major part of the New York City water supply system.[24] The section north of 33rd Street had mostly been excavated by November 1937.[20] By the beginning of the following year, the track junction north of the station was being constructed at a rate of 5 feet (1.5 m) per day.[24] The IRT's Sixth Avenue elevated closed in December 1938, just before the Sixth Avenue subway was completed.[25]

North of 47th–50th Streets, bellmouth tunnels were built to allow for a future extension under Central Park and along Morningside Avenue to 145th Street. The unbuilt extension was part of the Board of Transportation's long-range program and was budgeted at $34.914 million in August 1940. Construction was expected to start sometime after 1946.[26] The bellmouths diverged from the local and express tracks on both the northbound and southbound sides of the station, with tunnels that stub-ended at 53rd Street. In the meantime, all express trains originally turned west toward the Seventh Avenue station and the Washington Heights Line, while local trains turned east toward the Fifth Avenue/53rd Street station and the Queens Boulevard Line.[27]

Opening and use

1940s to 1960s

Looking east at the entrance to the 47th–50th Street–Rockefeller Center station inside 30 Rockefeller Plaza and NBC Studios from across Sixth Avenue. The entrance has gold trimmings and signs reading "Subway".
Entrance to the station inside 30 Rockefeller Plaza

The station opened on December 15, 1940, as part of the mainline portion of the IND Sixth Avenue Line to West Fourth Street–Washington Square.[28][29] At the time, it was known as 47th Street–50th Street–Rockefeller Center.[30] On the line's opening day, the Rockefeller Center station was the busiest of the six new stations. There were connections from the station's mezzanine to the basements of 1230 Sixth Avenue and 30 Rockefeller Plaza.[29] The opening of the Sixth Avenue Line relieved train traffic on the Eighth Avenue Line, which was used by all IND services except for the GG Brooklyn–Queens Crosstown service.[31] The BB train served part of the Sixth Avenue Line's midtown section during weekday rush hours only, running local between 168th Street and 34th Street–Herald Square. The entirety of the midtown section was served at all times by the D and F trains.[32][33] In early 1949, the BOT announced that an automatic shoe-shine machine would be installed at the station as part of a pilot program.[34] To improve cleanliness, the BOT also installed a "hygiaphone" at the station agent's booth; the device was composed of a transparent membrane and was meant to reduce the spread of germs.[35]

Rockefeller Center Inc., the owners of Rockefeller Center, announced in 1956 that it would construct the Time-Life Building at 1271 Avenue of the Americas, with a passageway from the basement to the Rockefeller Center station.[36] A similar passageway was built from the basement of 1285 Avenue of the Americas, one block north of the Time-Life Building.[37] In February 1958, Rockefeller Center Inc. leased 15,000 square feet (1,400 m2) in the northern mezzanine for 20 years at a total cost of $2 million over that period. Architects Harrison & Abramovitz were hired to redesign the mezzanine with stores similar to Rockefeller Center's underground mall.[38][39] The renovation of the mezzanine was completed in February 1960, along with the passageway to 1271 Avenue of the Americas. Workers installed about 15,000 square feet (1,400 m2) of asbestos floor tiles as part of the project, and they also installed white, gray, and black panels on the walls, ceilings, and columns.[40]

The bellmouths north of the Rockefeller Center station went unused until 1962, when the New York City Transit Authority (NYCTA) announced it would extend the Sixth Avenue Line to 57th Street as part of the Chrystie Street Connection.[27][41] Construction of the spur cost $13.2 million.[42] With the completion of express tracks between West Fourth and 34th Streets in 1967, the B and D trains started running express on the Sixth Avenue Line.[43] The 57th Street station opened in 1968,[41][42] upon which KK trains began serving the Rockefeller Center station.[44]

1970s to present

As part of the construction of 1211, 1221, and 1251 Avenue of the Americas in the early 1970s, passageways were constructed from the basements of each building to the Rockefeller Center station.[45] The new passageways had been completed by 1974.[46] The NYCTA installed turnstiles and stairways to accommodate the additional passenger traffic, and Rockefeller Center Inc. paid for the improvements.[45] An entrance with glazed-brick walls was added at 48th Street. In addition, Rockefeller Center Inc. built a passageway between 47th and 49th Streets, running parallel to the station's mezzanine.[47] The station was also served by the JFK Express from 1978[48] to 1990 when it was discontinued.[49]

The Metropolitan Transportation Authority (MTA) announced in 1990 that it would spend $730 million to renovate 74 subway stations, including the Rockefeller Center station.[50] In 1994, amid a funding shortfall, the administration of mayor Rudy Giuliani proposed delaying the station's renovation.[51][52] That October, the MTA announced it had indefinitely postponed plans for renovating the Rockefeller Center station.[50][53] The station's token booths were shuttered in May 2005, after fare tokens were replaced with MetroCards; station agents were deployed elsewhere in the station to answer passengers' queries. This was part of a pilot program that was tested at seven other stations.[54] By the mid-2000s, the New York City Transit Riders Council had ranked the Rockefeller Center station as among the system's dirtiest subway stations. The group described the station as having leaky ceilings, litter, dirty walls and floors, and water on the floor.[55] The MTA again proposed renovating the station as part of its 2005–2009 capital program, but it postponed these plans in 2005 due to a lack of funding.[56][57] Elevators between the mezzanine and either platform were installed in 2008–2009.[58]

Station layout

Ground Street level Exit/entrance
Mezzanine Fare control, station agent, Rockefeller Center concourse
Disabled access Elevator at the northwest corner of 6th Avenue and 49th Street
Platform
level
Northbound local "F" train"F" express train toward Jamaica–179th Street (57th Street)
"M" train weekdays toward Forest Hills–71st Avenue (Fifth Avenue/53rd Street)
Island platform Disabled access
Northbound express "B" train weekdays toward Bedford Park Boulevard or 145th Street (Seventh Avenue)
"D" train toward Norwood–205th Street (Seventh Avenue)
Southbound local "F" train"F" express train toward Coney Island-Stillwell Avenue via Culver (42nd Street–Bryant Park)
"M" train weekdays toward Middle Village–Metropolitan Avenue (42nd Street–Bryant Park)
Island platform Disabled access
Southbound express "B" train weekdays toward Brighton Beach (42nd Street–Bryant Park)
"D" train toward Coney Island–Stillwell Avenue via West End (42nd Street–Bryant Park)

The 47th–50th Streets–Rockefeller Center station is an express stop with four tracks and two island platforms.[59]: 124  The D and F stop here at all times,[60][61] while the B and M stop here only on weekdays during the day.[62][63] The B and D run on the express tracks and the F and M run on the local tracks.[64] The next stop to the north is Seventh Avenue for B and D trains, 57th Street for F trains, and Fifth Avenue/53rd Street for M trains, while the next stop to the south is 42nd Street–Bryant Park for all service.[65]

The mezzanine of the 47th–50th Streets–Rockefeller Center station. There are several passengers walking toward a turnstile in the background.
View of the station's mezzanine

A mezzanine runs above the entire length of the station.[59]: 124  The 47th–50th Streets–Rockefeller Center station is fully wheelchair-accessible, with elevators connecting the street, mezzanine, and platforms.[66] There are a total of fourteen stairs and two elevators from the mezzanine to the platforms. Each platform has seven stairs and one elevator.[59]: 125  Rockefeller Center's underground mall, built in 1935 as part of the complex's construction,[67] contains passageways to the station's mezzanine.[68] The walls of the station contain red-tile bands bordered in chocolate brown.[69] The tile colors are intended to help riders identify their station more easily, part of a color-coded tile system for the entire IND network.[70]

Track layout

The westernmost track of either platform is used by express trains while the easternmost track is used by local trains. This is to avoid level junctions with the IND Queens Boulevard Line, which is perpendicular with the IND Sixth Avenue Line north of this station.[71][72] As a result, the southbound tracks are the reverse of the New York City Subway's traditional local–express track arrangement, wherein the express track is outside and the local track is inside.[71] To the north of the station, the line splits into two levels.[24] Express trains come from the Bronx via a connection from the IND Eighth Avenue Line while local trains come from Queens via the 53rd Street Tunnel. Both the local and the express tracks can also access the 63rd Street Line, connecting both to Queens and to the Second Avenue Subway.[71]

South of this station, between 43rd and 46th Streets, the line splits into three tunnels: a double-track tunnel for the two northbound tracks and two single tubes for each of the southbound tracks. The downtown express track rises above the other three tracks and crosses above the downtown local track approximately 320 feet (98 m) north of 43rd Street. The line returns to the traditional arrangement in both directions at 42nd Street–Bryant Park, with the local tracks outside the express tracks.[72]

Exits

Diagram of Rockefeller Center. The subway entrance at Sixth Avenue and 48th Street is marked by a blue dot.
Diagram of Rockefeller Center. The subway entrance at Sixth Avenue and 48th Street is marked by a blue dot.

The station has numerous passageways and exits, including fourteen street stairs and an elevator.[73] There are four fare control areas along the mezzanine at 47th Street, at 48th Street, between 48th and 49th Streets, and at 49th Street.[59]: 124 

At the northern end of the station, there are passageways directly to 1251 Avenue of the Americas, 1271 Avenue of the Americas, and 30 Rockefeller Plaza. The southwest and northwest corners of Sixth Avenue and 50th Street each contain one stair. A third stair is placed within the Radio City Music Hall building on the northeast corner of that intersection.[73] At the northwest corner of Sixth Avenue and 49th Street, within 1251 Avenue of the Americas' plaza, is a stair and an elevator. A stair within 30 Rockefeller Plaza leads to the northeast corner of that intersection. Between 48th and 49th Streets, there are two stairs within the courtyard of 1221 Avenue of the Americas on the west side of Sixth Avenue. In addition, there is a stair inside 1230 Avenue of the Americas on the east side of Sixth Avenue, as well as a passageway into that building's basement.[73]

One staircase each leads to the northeast and southeast corners of Sixth Avenue and 48th Street. At the southwest corner of that intersection, there is a staircase within the plaza of 1211 Avenue of the Americas, as well as a passageway directly to that building. The northeast, southeast, and southwest corners of Sixth Avenue and 47th Street each contain one staircase as well.[59]: 125 [73] The entrance on the southwest corner of 47th Street and Sixth Avenue was not opened along with the rest of the station.[74] A passageway leads to other buildings on the west side of Sixth Avenue south of 47th Street.[59]: 125 

References

  1. ^ "Glossary". Second Avenue Subway Supplemental Draft Environmental Impact Statement (SDEIS) (PDF). Vol. 1. Metropolitan Transportation Authority. March 4, 2003. pp. 1–2. Archived from the original (PDF) on February 26, 2021. Retrieved January 1, 2021.
  2. ^ a b "Annual Subway Ridership (2018–2023)". Metropolitan Transportation Authority. 2023. Retrieved April 20, 2024.
  3. ^ "Two Subway Routes Adopted by City". The New York Times. August 4, 1923. p. 9. ISSN 0362-4331. Archived from the original on June 30, 2019. Retrieved August 1, 2019.
  4. ^ "Plans Now Ready to Start Subways". The New York Times. March 12, 1924. p. 1. ISSN 0362-4331. Archived from the original on June 28, 2019. Retrieved August 1, 2019.
  5. ^ a b "Delaney For Razing Elevated Line Now; Work in 6th Av. Could Begin in Six Months if Condemnation Started at Once, He Says. Sees Cut In Subway Cost Eliminating Need for Underpinning Would Save $4,000,000 and Speed Construction, He Holds". The New York Times. January 11, 1930. ISSN 0362-4331. Archived from the original on April 28, 2018. Retrieved April 27, 2018.
  6. ^ "New Subway Routes in Hylan Program to Cost $186,046,000 – Board of Transportation Adopts 22.90 Miles of Additional Lines – Total Now $345,629,000 – But the Entire System Planned by Mayor Involves $700,000,000 – Description of Routes – Heaviest Expenditures Will Be Made on Tunnels – No Allowance for Equipment – New Subway Routes to Cost $186,046,000". The New York Times. March 21, 1925. ISSN 0362-4331. Archived from the original on April 9, 2018. Retrieved April 8, 2018.
  7. ^ "6th Av. Subway Plan Hinges On Tubes' Use; City Must Reach Agreement With Hudson & Manhattan to Carry Out Project". The New York Times. November 20, 1924. ISSN 0362-4331. Archived from the original on April 26, 2018. Retrieved April 26, 2018.
  8. ^ "Final Contracts To Finish Subway Awarded By City; Include $20,000,000 for Cars, Equipment and Substations for Manhattan Line. Operation Set For 1931 Board of Transportation Moves to Rid Sixth Avenue of Trolley Tracks. Seeks To Buy Franchise Line Willing to Exchange It for Bus Permit—Negotiations Pushed to Extend Tube". The New York Times. August 1, 1929. ISSN 0362-4331. Archived from the original on April 26, 2018. Retrieved April 26, 2018.
  9. ^ "104 Station Sites for City's Subways Chosen by Board; The Layout Calls for 39 in Manhattan, 30 in Brooklyn, 25 in Queens, 10 in Bronx". The New York Times. June 2, 1930. ISSN 0362-4331. Archived from the original on June 30, 2018. Retrieved July 14, 2022.
  10. ^ "The Sixth Avenue Subway". The New York Times. April 21, 1931. ISSN 0362-4331. Archived from the original on April 28, 2018. Retrieved April 28, 2018.
  11. ^ "Plans To Be Drawn For 6th Av. Subway; 80 Engineers and Draftsmen to Begin Work at Once on Detailed Specifications". The New York Times. March 1, 1935. ISSN 0362-4331. Archived from the original on April 28, 2018. Retrieved April 28, 2018.
  12. ^ "6th Av. Tube Work to Be Begun Oct. 1; Plans Speeded on $12,000,000 Section From 49th to 39th St. -- Public Hearing Set". The New York Times. August 8, 1935. ISSN 0362-4331. Archived from the original on April 16, 2018. Retrieved July 10, 2022.
  13. ^ "Aug. 23 Set for Hearing On 6th Av. Subway Bids: Proposals for 39th to 49th Sts. Link To Be Considered Then". New York Herald Tribune. October 8, 1935. p. 2. ProQuest 1221734015.
  14. ^ "Subway Award Goes To Rosoff Company; Sixth Av. Contract Is Let Under Specified Use of Excavated Rock Despite Lower Bid". The New York Times. October 31, 1935. ISSN 0362-4331. Archived from the original on April 28, 2018. Retrieved April 28, 2018.
  15. ^ "$6,040,000 Contract For City Subway Awarded". Wall Street Journal. October 31, 1995. p. 10. ISSN 0099-9660. ProQuest 128702539.
  16. ^ "Mayor to Start Work on Sixth Av. Subway; La Guardia to Use Pneumatic Drill at Ceremony at Noon Tomorrow in Bryant Park". The New York Times. March 22, 1936. ISSN 0362-4331. Archived from the original on July 10, 2022. Retrieved July 10, 2022.
  17. ^ "Mayor Starts Construction of 6th Av. Subway: Demands Razing of "El" as He Breaks Ground at Bryant Park Entrance Appeals for Unification Warns Rate War Is Likely to Follow Failure of Plan". New York Herald Tribune. March 24, 1936. p. 9. ProQuest 1222069808.
  18. ^ Harrington, John Walker (October 18, 1936). "A Subway Creeps Up Sixth Ave.; Pipes and Tracks Are Obstacles: First Section Is Well Started and Two More Are About to Begin Extending City's Line Without Disturbing Elevated or Street Traffic". New York Herald Tribune. p. A7. ProQuest 1322387831.
  19. ^ "Subway Contract Let; 6th Av. Line From 47th to 53d St. to Cost $4,616,476". The New York Times. November 18, 1936. ISSN 0362-4331. Archived from the original on July 11, 2022. Retrieved July 10, 2022.
  20. ^ a b c "The Tube Takes Shape in 6th Av.: Most of the Excavation Is Done, And, Considering, Done Quietly: Despite the Intricacies of Underground Utility Facilities and Overhead Elevated Line, There Are Fewer Inconveniences and Complaints on Tliis Project Than Construction Usually Brings". New York Herald Tribune. November 7, 1937. p. A3. ProQuest 1223317978.
  21. ^ "Real Estate News and Market Transactions of New York City and Metropolitan Area: 6th Av. Subway, 5 Years to Go, Is Taking Shape Tube That Passes Over and Under Other Tunnels Runs Into Some Problems Mid-Town Sixth ... Subway Station s It Looks Today". New York Herald Tribune. May 18, 1937. p. 37. ProQuest 1240403778.
  22. ^ "A Thousand Miles of Buried Pipes and Wires: Maze on 6th Ave. Subway Route Is Dug Up, Sorted and Put Together Again Network Is Straightened Out With No Disruption of the City's Utilities". New York Herald Tribune. September 17, 1939. p. A3. ProQuest 1259078550.
  23. ^ Harrington, John W. (May 5, 1935). "City Plans Its Costliest Subway; In a Short Two Miles Under Sixth Avenue the Engineers Will Encounter Many Intricate Problems". The New York Times. ISSN 0362-4331. Archived from the original on July 11, 2022. Retrieved July 11, 2022.
  24. ^ a b c "6th Av. Subway To Allow for Wide Pavement: Inspection Reveals Plan to Enlarge Street Space When Elevated Comes Down Burrowing Under the Heart of Manhattan for Sixth Avenue's New Subway Line". New York Herald Tribune. February 17, 1938. p. 21A. ProQuest 1242866935.
  25. ^ "Gay Crowds On Last Ride As Sixth Ave. Elevated Ends 60-Year Existence; 350 Police On Duty But the Noisy Revelers Strip Cars in Hunt for Souvenirs Suit May Delay Razing Little Threat Seen to Plan, However-Jobless Workers to Press Their Protest Makes Only One Stop Entrances Are Boarded Up Final Trains Run On Elevated Line Police Guard Structure". The New York Times. December 5, 1938. ISSN 0362-4331. Archived from the original on April 26, 2018. Retrieved April 26, 2018.
  26. ^ "Transit Projects Seek $771,256,499 – Board Asks This as Capital Outlay for 6 Years, Including $154,330,244 for 1941 – Outlines Vast Program – Ambitious Plans to Make Most of Unification Face Knife of Planning Commission – $10,607,000 Engineering Cost – Wants Transfer Links". The New York Times. August 12, 1940. ISSN 0362-4331. Archived from the original on April 16, 2018. Retrieved April 15, 2018.
  27. ^ a b Katz, Ralph (January 31, 1962). "Addition Planned for 6th Ave. Line; Transit Board Asks 5-Block Spur Above 53d Street". The New York Times. ISSN 0362-4331. Archived from the original on July 11, 2022. Retrieved July 11, 2022.
  28. ^ "First-Day Traffic on 6th Ave. Line Greatly Exceeds All Expectations; But Real Test of New Subway Will Come in Today's Rush Hours--Mezzanine Corridor Evokes General Approval". The New York Times. December 16, 1940. ISSN 0362-4331. Archived from the original on July 11, 2022. Retrieved July 11, 2022.
  29. ^ a b "6th Av. Subway Opens Complete Service Today: Rush-Hour Schedules On at 7 A. M.; Bronx and Queens To Be Affected". New York Herald Tribune. December 16, 1940. p. 10. ProQuest 1263396247.
  30. ^ "6th Ave. Subway Runs Test Trains; Practices for Opening Next Sunday". The New York Times. December 8, 1940. ISSN 0362-4331. Archived from the original on July 11, 2022. Retrieved July 11, 2022.
  31. ^ "New Subway to Add 2 Need Services – Opening of 6th Ave. Line to Provide Uptown Local Route and More Queens Expresses". The New York Times. December 2, 1939. ISSN 0362-4331. Archived from the original on April 16, 2018. Retrieved April 15, 2018.
  32. ^ "6th Ave. Tube Adds Two New Services – Provides Express Facilities to Queens and Local Trains to Washington Heights – Subway Opens on Dec. 15 – Changes in Routings on Other Lines to Bring Faster Time and Less Congestion". The New York Times. December 5, 1940. ISSN 0362-4331. Archived from the original on June 17, 2018. Retrieved April 15, 2018.
  33. ^ "6th Av. Subway To Run 24-Hour Bronx Express: Schedule of Trains Posted for Opening, at 12:01 A. M. on Sunday, Dec. 15". New York Herald Tribune. December 5, 1940. p. 15. ProQuest 1263335131.
  34. ^ "5c Shoeshine Machines Will Get Subway Tryout". New York Herald Tribune. January 30, 1949. p. 1. ProQuest 1325338277.
  35. ^ "In Short; Subway Tests Hygiaphone". New York Herald Tribune. February 4, 1949. p. 21. ProQuest 1326781247.
  36. ^ Ennis, Thomas W. Jr. (December 14, 1956). "Rockefeller Center To Add Skyscraper" (PDF). The New York Times. ISSN 0362-4331. Archived from the original on March 20, 2022. Retrieved November 16, 2017.
  37. ^ "42-story Building Begun on 6th Ave.; New Equitable Life Home at 51st St. to Cost 58 Million -- Completion Set for '61". The New York Times. August 12, 1958. ISSN 0362-4331. Archived from the original on July 11, 2022. Retrieved July 11, 2022.
  38. ^ Katz, Ralph (February 10, 1958). "Lease to Enrich Subway System: Rockefeller Center to Pay 2 Million in 20 Years to Use IND Mezzanine". The New York Times. ISSN 0362-4331. Archived from the original on July 16, 2021. Retrieved July 16, 2021.
  39. ^ "IND Station To Have Its Face Lifted: For Rockefeller Center Stores". New York Herald Tribune. February 10, 1958. p. 5. ProQuest 1328092620.
  40. ^ Gleason, Gene (February 9, 1960). "50th St, 1ND Station in New Dress: $85,000 Spent by Rockefeller Center on Redecorating Job". New York Herald Tribune. p. 10. ProQuest 1324118287.
  41. ^ a b Raskin, Joseph B. (2013). The Routes Not Taken: A Trip Through New York City's Unbuilt Subway System. New York, New York: Fordham University Press. doi:10.5422/fordham/9780823253692.001.0001. ISBN 978-0-82325-369-2.
  42. ^ a b "Luncheon in Subway Opens Station". The New York Times. June 27, 1968. ISSN 0362-4331. Archived from the original on December 16, 2021. Retrieved September 18, 2017.
  43. ^ Perlmutter, Emanuel (November 27, 1967). "BMT-IND Changes Bewilder Many; Transit Authority Swamped With Calls From Riders as New System Starts". The New York Times. ISSN 0362-4331. Archived from the original on June 16, 2018. Retrieved August 23, 2015.
  44. ^ Kaplan, Morris (July 2, 1968). "New Subway Line Has Bumpy Debut; Rush-Hour Service Suffers Variety of First-Day Kinks". The New York Times. ISSN 0362-4331. Archived from the original on July 11, 2022. Retrieved July 11, 2022.
  45. ^ a b Fowler, Glenn (March 21, 1971). "Rockefeller Center Growing Down: Under Rockefeller Center, Concourse Is Growing". The New York Times. p. R1. ISSN 0362-4331. ProQuest 119210304.
  46. ^ Horsley, Carter B. (August 12, 1974). "Rockefeller Center's Expansion Unaffected by Vacant Offices". The New York Times. ISSN 0362-4331. Archived from the original on July 11, 2022. Retrieved July 11, 2022.
  47. ^ Dembart, Lee (February 18, 1977). "Catch the Subway of the Future". The New York Times. ISSN 0362-4331. Archived from the original on February 22, 2020. Retrieved July 11, 2022.
  48. ^ Pitt, David E. (October 22, 1989). "Transit Agency Wants to End Airport Express". The New York Times. ISSN 0362-4331. Retrieved June 10, 2023.
  49. ^ The New York Times (March 11, 1990). "JFK express subway to be discontinued". New York City: Observer–Reporter. p. 54. Retrieved July 22, 2016.
  50. ^ a b McKinley, James C. Jr. (October 15, 1994). "City to Delay Subway Work At 6 Stations". The New York Times. ISSN 0362-4331. Archived from the original on July 5, 2022. Retrieved July 4, 2022.
  51. ^ Rein, Lisa (May 24, 1994). "Citing cuts, TA derails Main St. rehab". New York Daily News. p. 683. Archived from the original on July 11, 2022. Retrieved July 11, 2022.
  52. ^ Sachar, Emily (February 6, 1994). "The Giuliani Budget; No Free Ride for Rudy Faces wrath of Albany on subway cuts". Newsday. p. 19. ProQuest 278734171.
  53. ^ Kalikow, Peter (October 27, 1994). "The Coliseum Could Lay a Golden Egg". Newsday. pp. 44, 48. Retrieved May 31, 2023.
  54. ^ Chan, Sewell (May 3, 2005). "Eight Subway Stations to Deploy Agents to Assist Passengers". The New York Times. ISSN 0362-4331. Archived from the original on May 29, 2015. Retrieved August 19, 2016.
  55. ^ Boone, Marshand (August 5, 2004). "Rockefeller's Dirty Distinction, Station Is Ranked Worst in Manhattan to Disbelief of Some, but Bronx Stations Lead List of the Worst". Newsday. p. A22. ProQuest 279817893.
  56. ^ Donohue, Pete (June 21, 2005). "12 Subway Stations Out of Funds Loop". New York Daily News. p. 4. ProQuest 305961613.
  57. ^ Chan, Sewell (April 26, 2005). "M.T.A., Adjusting Budget, Cuts Back Station Overhauls". The New York Times. ISSN 0362-4331. Archived from the original on July 11, 2022. Retrieved July 11, 2022.
  58. ^ "47-50 Streets-Rockefeller Center (B,D,F,M)". The Subway Nut. Retrieved October 13, 2023.
  59. ^ a b c d e f "12: Transportation". East Midtown Rezoning and Related Actions Final Environmental Impact Statement (PDF). New York: New York City Department of City Planning. 2013. p. 124. Archived (PDF) from the original on August 11, 2019. Retrieved April 1, 2021.
  60. ^ "D Subway Timetable, Effective June 30, 2024". Metropolitan Transportation Authority. Retrieved June 28, 2024.
  61. ^ "F Subway Timetable, Effective June 30, 2024". Metropolitan Transportation Authority. Retrieved June 28, 2024.
  62. ^ "B Subway Timetable, Effective June 30, 2024". Metropolitan Transportation Authority. Retrieved June 28, 2024.
  63. ^ "M Subway Timetable, Effective June 30, 2024". Metropolitan Transportation Authority. Retrieved June 28, 2024.
  64. ^ "Subway Service Guide" (PDF). Metropolitan Transportation Authority. September 2019. Retrieved September 22, 2019.
  65. ^ "Subway Map" (PDF). Metropolitan Transportation Authority. September 2021. Retrieved September 17, 2021.
  66. ^ "MTA Accessible Stations". New York: Metropolitan Transportation Authority. May 20, 2022. Archived from the original on December 10, 2021. Retrieved July 5, 2022.
  67. ^ "Rockefeller City Finishes Tunnels" (PDF). The New York Times. May 4, 1935. ISSN 0362-4331. Archived from the original on July 15, 2022. Retrieved November 11, 2017.
  68. ^ Jackson, Kenneth T., ed. (2010). The Encyclopedia of New York City (2nd ed.). New Haven: Yale University Press. p. 1115. ISBN 978-0-300-11465-2.
  69. ^ Whitehorne, Wayne; Sklar, Bob (July 11, 2022). "IND Station Tile Colors". nycsubway.org. Archived from the original on May 4, 2022. Retrieved July 11, 2022.
  70. ^ "Tile Colors a Guide in the New Subway; Decoration Scheme Changes at Each Express Stop to Tell Riders Where They Are". The New York Times. August 22, 1932. ISSN 0362-4331. Archived from the original on July 1, 2022. Retrieved July 1, 2022.
  71. ^ a b c Dougherty, Peter (2006) [2002]. Tracks of the New York City Subway 2006 (3rd ed.). Dougherty. OCLC 49777633 – via Google Books.
  72. ^ a b Vogel, W. P. Jr. (July 11, 1937). "Work to Begin On Last 6th Av. Tube Link Soon: With 9th-18th St. Contract Let, $57,000,000 Project Will Be Ready in 1941 No Federal Aid for City Man-Made, Natural Hazards Pose Many Problems". New York Herald Tribune. p. A3. ProQuest 1248809011.
  73. ^ a b c d "MTA Neighborhood Maps: 47-50 Sts-Rockefeller Center (B)(D)(F)(M)". New York: Metropolitan Transportation Authority. 2015. Archived from the original on December 16, 2021. Retrieved December 11, 2015.
  74. ^ Hacker, Emory (February 27, 1941). "Sixth Ave. Bottleneck—47th St. Exit Brings Complaint" (PDF). New York Post. Archived (PDF) from the original on July 15, 2022. Retrieved July 11, 2022.
Kembali kehalaman sebelumnya