Share to: share facebook share twitter share wa share telegram print page

 

Majura Parkway

Majura Parkway

Majura Parkway is located in Australian Capital Territory
South end
South end
North end
North end
Coordinates
General information
TypeParkway
Length11.5 km (7.1 mi)[1]
Opened20 April 2016
Built byFulton Hogan
Maintained byTransport Canberra and City Services Directorate
Route number(s) M23 (2016–present)[2]
Major junctions
South end Monaro Highway
Fyshwick, Australian Capital Territory
 
North endHorse Park Drive
Majura, Australian Capital Territory
Highway system

Majura Parkway is a 11.5-kilometre-long (7.1 mi)[1] north–south parkway located in the Majura district of the Australian Capital Territory (ACT). It links the interchange with Federal Highway and Horse Park Drive at the edge of Gungahlin district to Monaro Highway in Fyshwick.

The parkway had been in planning since the 1970s and is considered an important access road to and from the Gungahlin district. The parkway provides a more efficient transport link in the area and conveys a large numbers of freight vehicles. The project was jointly funded by the ACT and Australian Governments, at a total cost of A$288 million.

Route description

External videos
Project flyover animations
video icon Majura Parkway Northbound on YouTube
video icon Majura Parkway Southbound on YouTube
video icon Majura Parkway Bridgework on YouTube
External image
Area map
image icon Majura Valley area on Google Maps.

Majura Parkway traverses the length of the largely rural Majura Valley within the ACT, providing a parkway standard link between the northern terminus of Monaro Highway in the territory's east and Federal Highway in the north, close to the New South Wales border. Other benefits of the Majura Parkway include more efficient freight transportation, relieving traffic congestion, supporting future growth of Canberra Airport, and easier movement between Canberra's northern and southern suburbs.[3][4]

The roadway starts as a continuation from the northern end of the Monaro Highway. It then crosses the Molonglo River, and Morshead Drive as part of a singular bridge structure, just to the west of the current Morshead Drive / Pialligo Avenue intersection. The next section of the parkway entirely replaces the northern arm of Morshead Drive with a raised section of roadway, before crossing over Fairbairn Road at the location of the current Morshead Drive / Fairbairn Road intersection.[5][6]

From this point the roadway enters farmland, and grasslands; the parkway itself aligned just to the west of Woolshed Creek. Towards the northern end of the valley, the parkway bisects the Majura Pine Plantation. North of the plantation the parkway gains a service road along its western side, allowing southbound access via an overpass to businesses in that area. This service road continues a short distance to the north until it meets the access road to the Mount Majura air navigation facility, which is located atop the nearby Mount Majura.[5][6]

The remainder of the roadway from the plantation to the north follows the previous Majura Road alignment, curving westwards to meet the existing interchange with Federal Highway. The roadway itself then continues on through the interchange into the Gungahlin district as Horse Park Drive.[5][6]

The parkway is dual carriageway for the entirety of its length. Each traffic lane is 3.5-metre (11 ft) wide, with a 2.5-metre (8.2 ft) wide outside shoulder, and a 1-metre (3.3 ft) wide median shoulder. The speed limit is 100 km/h (60 mph). By 2030, the Majura Parkway is expected to carry approximately 40,000 vehicles each day, with 6,000 of those being freight vehicles.[7][8] The stated cost is A$288 million, and is jointly funded by the ACT Government and the Australian Government, both committing $144 million to the project.[9]

Artist's Impression of parts of Majura Parkway and Majura Road traversing Majura Valley. This image only shows approximate alignment, and does not include intersections or interchanges. Neither the northern or southern ends of the parkway are visible in this image.

History

The Molonglo River bridge under construction in October 2014
Majura Parkway and Mount Majura solar farm in 2017

The planning of Majura Parkway began with the Tomorrow's Canberra (1970) National Capital Development Commission (NCDC) report which identified the Majura Valley corridor as a component of Canberra's peripheral road system. Further NCDC and National Capital Authority (NCA) studies including Metropolitan Canberra (1984) and the Canberra Spatial Plan (2004) identified the need for a primary road link in the area. This was also backed up by the Gungahlin External Travel Study Information Report (1989) identifying four main access roads needed for residents of the Gungahlin district.[10]

From the SMEC Concept Evaluation Report (2006), Roads ACT identified two preferred alignments, which were known as the western and the eastern alignments. The eastern alignment was later scrapped because of environmental, heritage, and social issues along that corridor, leaving the western alignment as the only preferred alignment. The scrapped eastern alignment would have also included a link to a future urban area in the Kowen District. Resumption of land for the parkway mostly involved farmland, although part of the Majura Pine Plantation was acquired for the new road alignment. The Royal Military College, Duntroon has also lost some parts of its playing fields, though the historic Oval No.1 is preserved.[10][5]

Some concerns were raised about the parkway occupying land now used for offroad recreational cycling in the Majura Pine Plantation; however by the later stages of the planning process, two large culverts had been planned in this area which would ease access between both sides of the plantation for recreational cyclists and other users.[11] Concerns were also raised by the Geological Society of Australia in regards to the construction works affecting a fossil site on Woolshed Creek in the vicinity of the Fairbairn Avenue southbound offramp. The Geological Society of Australia later accepted assurances from the ACT Government that the site would be protected.[12][13]

Preparatory roadworks on nearby roads began in 2008, with the main project beginning in September 2012 when Fulton Hogan was awarded the contract to build. Major construction then began in January 2013,[14][15] creating around 350 jobs.[16]

The end of construction for the Majura Parkway project was formally announced on Friday 22 April 2016,[17] coinciding with the naming of the Malcolm Fraser Bridge, the most prominent feature of the project, which runs over the Molonglo River. The bridge's name was unveiled by Tamara 'Tamie' Fraser, wife of the former Prime Minister.[18] The off-ramp to Meddhung Road linking to the Majura shopping precinct was opened later on 22 December 2017.[19]

Majura Parkway has now largely replaced Majura Road, which was formerly the main route through the valley and carried approximately 18,000 vehicles each day, but as a single carriageway rural road, lacked capacity to cope with future increases in traffic. The need for its replacement with a more efficient, higher capacity roadway was highlighted in several studies.[10][20] The southern alignment of Majura Road remains largely intact to serve local traffic to various facilities located in the Majura Valley, multiple rural properties and Canberra Airport's business precinct.[7]

Majura Parkway construction works, as of mid-April 2013

Interchanges

District[21]Location[21]km[1]miDestinationsNotes
Canberra CentralFyshwick00.0 Monaro Highway (M23 south) – Fyshwick, CoomaSouthern terminus of parkway, route M23 continues south along Monaro Highway
Molonglo River0.60.37Malcolm Fraser Bridge
Canberra CentralMajura borderCampbellPialligo border0.70.43Morshead Drive (west) – Civic, Campbell
Pialligo Road (east) – Queanbeyan, Canberra Airport
Half diamond interchange, northbound exit, southbound entry only
1.00.62 Fairbairn Avenue – Civic, Campbell, Queanbeyan, Canberra AirportDiamond interchange
Pialligo1.81.1Meddhung Road – Majura Park Shopping CentreSouthbound exit only
Majura7.34.5Tambreet Street – AFP Training Facility, Innabaanya Girl Guide Camp, Majura Training AreaDiamond interchange
8.95.5Majura RoadMajura Defence RangeSouthbound access via LILO T-intersection
9.76.0Mount Majura Road – Mount Majura air navigation facilityNorthbound access via LILO T-intersection
10.46.5Hector McIntosh Grove – Shooting rangesSouthbound access via LILO T-intersection
MajuraGungahlin border11.57.1 Federal Highway (M23 north, A23 south) – Civic, Lyneham, Sydney, GoulburnDiamond interchange with single cloverleaf offramp, allows non-stop access to both directions of Federal Highway
Route M23 continues north along Federal Highway
Horse Park Drive (west) – GungahlinNorthern terminus of parkway: continues west as Horse Park Drive
Map depicting the Majura Parkway and adjoining roads post-completion

See also

References

  1. ^ a b c "Majura Parkway" (Map). Google Maps. Retrieved 9 November 2022.
  2. ^ "Guide Signs MIS 12" (PDF). ACT Government. April 2019. p. 13. Archived from the original (PDF) on 28 March 2020. Retrieved 9 November 2022.
  3. ^ "Project Details: Majura Parkway". Nation Building Program. Australian GovernmentDepartment of Infrastructure and Transport. 25 March 2013. Retrieved 28 July 2013.
  4. ^ Gallagher, Katy (5 February 2013). "Construction on the Majura Parkway Begins" (Press release). ACT Government. Retrieved 28 July 2013.
  5. ^ a b c d "Chapter 5 (Land Impacts)" (PDF). Majura Parkway Final EIS Report. SMEC. 26 February 2010. pp. 5–2. Retrieved 28 June 2013.
  6. ^ a b c "Chapter 6 (Ecological Impacts)" (PDF). Majura Parkway Final EIS Report. SMEC. 26 February 2010. pp. 6–3. Retrieved 28 June 2013.
  7. ^ a b "Majura Parkway: FAQs". ACT Government. 10 April 2012. Archived from the original on 20 February 2013. Retrieved 28 June 2013.
  8. ^ "Majura Parkway: Design & Construction". ACT Government. 12 April 2012. Archived from the original on 20 February 2013. Retrieved 28 June 2013.
  9. ^ "Construction on the Majura Parkway Begins". Minister for Infrastructure and Transport. 5 February 2013. Archived from the original on 4 May 2013. Retrieved 29 June 2013.
  10. ^ a b c "Majura Parkway: Planning History". ACT Government. 10 April 2012. Archived from the original on 20 February 2013. Retrieved 28 June 2013.
  11. ^ Strachan, Julieanne (10 July 2011). "Race on to save Majura Pines trails". Canberra Times.
  12. ^ Hall, Bianca (9 July 2011). "Fears Majura Parkway will run through a significant fossil site". Canberra Times.
  13. ^ "Chapter 11 (Consultation Summary Part 1)" (PDF). Majura Parkway Final EIS Report. SMEC. 26 February 2010. pp. 11–8. Retrieved 30 June 2013.
  14. ^ "Majura Parkway: Associated road works". ACT Government. 10 April 2012. Archived from the original on 20 February 2013. Retrieved 28 June 2013.
  15. ^ "Majura Parkway: Early works construction update". ACT Government. 24 December 2012. Archived from the original on 20 February 2013. Retrieved 28 June 2013.
  16. ^ "Majura Parkway construction officially begins". ABC News. Australian Broadcasting Corporation (ABC). 5 February 2013. Retrieved 28 July 2013.
  17. ^ "Majura Parkway open and Malcolm Fraser Bridge officially named". Paul Fletcher, MP. 22 April 2016. Archived from the original on 16 April 2018. Retrieved 9 November 2022.
  18. ^ Burgess, Katie (22 April 2016). "New Majura Parkway bridge over Molonglo River to be named after Malcolm Fraser". The Canberra Times. Fairfax Media. Archived from the original on 23 July 2016.
  19. ^ "New road linking Majura Parkway to Majura shopping precinct now open". Chief Minister, Treasury and Economic Development Directorate. 22 December 2017. Archived from the original on 19 April 2019. Retrieved 9 November 2022.
  20. ^ "Majura Parkway: About the Project". ACT Government. 31 July 2012. Archived from the original on 20 February 2013. Retrieved 28 June 2013.
  21. ^ a b ACTMAPi (Map). Cartography by Environment and Sustainable Development Directorate. ACT Government. Retrieved 9 November 2022.
Kembali kehalaman sebelumnya