Granada Metro
The Granada Metro (Metro de Granada in Spanish) is a single light rail line in the city of Granada, Spain and its metropolitan area. It crosses Granada and covers the towns of Albolote, Maracena and Armilla,[4] with underground sections in central Granada and overground sections elsewhere.[5] The line opened on 21 September 2017,[6] and serves 26 stations, of which 3 stations in central Granada are underground.[6] Construction of the line began in 2007.[7] The metro was initially planned to open in early 2012, and by May 2011 the line was 73% completed.[7] However, funding ran out as a result of the Spanish economic crisis,[5] with only 250 million of the estimated 502 million euros total cost available. In 2012, the remaining funds were secured through a 260 million loan from the European Investment Bank.[4] and the planned date of completion was moved to early 2014.[4] However, further delays resulted in a shortfall in funding, which was only resolved on 1 July 2014. The metro finally opened at noon on 21 September 2017.[8][6] Future expansionOwing to the higher than expected ridership and success of the metro, extensions are proposed on the existing line; westward from Armilla splitting into two branches to Cúllar Vega and another to Alhendín, and northwest from Albolote to Pinos Puente and/or Atarfe and Santa Fe.[9] New lines from Granada city centre to Peligros, Ogíjares and Federico García Lorca Granada Airport are also proposed.[10] Network mapReferences
External linksMedia related to Granada metro at Wikimedia Commons
|