Erligou station did not enter into operation along with Line 6 Phase I on December 30, 2012. Both Line 6 and Line 16 platforms opened on March 18, 2023.[1] The platform for Line 16 is above the Line 6 platform.[3]
Location
The station is located at the intersection of the north-south Sanlihe Road with the east-west thoroughfare known as Chegongzhuang West Road (车公庄西路) to the west of Sanlihe Road and Chegongzhuang Street (车公庄大街) to the east.[4]
Station layout
Both the line 6 and line 16 stations have underground side platforms. There are 5 exits, lettered A1, A2, B, C and D. Exits A1 and A2 are accessible via elevators.