Edinburgh and Glasgow Railway
The Edinburgh and Glasgow Railway was authorised by act of Parliament on 4 July 1838.[1][page needed][2][page needed] It was opened to passenger traffic on 21 February 1842, between its Glasgow Queen Street railway station (sometimes referred to at first as Dundas Street) and Haymarket railway station in Edinburgh. Construction cost £1,200,000 for 46 miles (74 km). The intermediate stations were at Corstorphine (later Saughton), Gogar, Ratho, Winchburgh, Linlithgow, Polmont, Falkirk, Castlecary, Croy, Kirkintilloch (later Lenzie) and Bishopbriggs. There was a ticket platform at Cowlairs. The line was extended eastwards from Haymarket to North Bridge in 1846, and a joint station for connection with the North British Railway was opened on what is now Edinburgh Waverley railway station in 1847. Patronage on the line quickly reached double the railway's initial estimates, and by 1850 58 locomotives and 216 coaches were needed to handle the traffic. Goods traffic started in March 1842 and slowly increased, overtaking passenger revenue by 1855.[1][page needed] The line still runs today as the main line between Edinburgh and Glasgow. It was electrified and improved under the auspices of the Edinburgh to Glasgow Improvement Programme.[3] 8-car electric Class 385 trains started operating from Monday 29 July 2019 between Glasgow and Edinburgh via Falkirk High.[4] The fastest trains are scheduled to take 42 minutes.[5] HistoryEarly schemesThe earliest railways in Scotland were waggonways, intended for horse drawn operation, in most cases from a colliery or other mineral source, to a waterway for onward transport. Notable early lines were the Kilmarnock and Troon Railway of 1812 and the Monkland and Kirkintilloch Railway of 1826, the first of the "coal railways" of the Monklands area. The Garnkirk and Glasgow Railway (G&GR) was authorised in the same year, and it opened in 1831. There were unfulfilled ideas of connecting Glasgow and Edinburgh as early as 1824[6][page needed] and when the G&GR got its authorising Act, there were thoughts of extending from Broomielaw in Glasgow over the G&GR to Edinburgh and Leith; the connection to sea-going shipping was paramount. In 1830 the railway engineers Thomas Grainger and John Miller were commissioned to survey for such a line. There was to be a tunnel under the centre of Glasgow but there was furious opposition to this; it was so strong that the proposal failed. The Liverpool and Manchester Railway had opened in 1830, and was more successful than its promoters expected, showing that an intercity railway could be commercially successful. The pressure to connect the two great cities of central Scotland continued, and in the second half of the 1830s money became freely available, and investors, chiefly in England (many of them shareholders in the Liverpool and Manchester line), promoted a viable railway. E&GR authorised
The Edinburgh and Glasgow Railway was authorised by the Edinburgh and Glasgow Railway Act 1838 (1 & 2 Vict. c. lviii) on 4 July.[1][page needed][2][page needed] The bill had been in committee for 37 days.[7][page needed] The first contract was let in late 1838, to William Aiton and his company.[8] Bad weather delayed the progress of the work but on New Years Day 1842 the public were invited to walk through the tunnel at Glasgow Queen Street. Policeman were stationed to prevent the entrance of disorderly persons.[7][page needed] The tunnel was whitewashed and gas lit, and the proceeds went to the Paisley Relief Fund and workmen injured on the railway.[9][page needed] The Glasgow terminal was designed by James Carswell.[10][page needed] The line was engineered as a main line, and substantial earthworks, viaducts and tunnels were incorporated into the route, forming an almost perfectly level route, apart from the climb out of the Glasgow terminal. The original intention was to descend gently into Glasgow, crossing over the Forth and Clyde Canal, but opposition from the canal company obliged the E&GR to be brought under it instead, resulting in a steep descent at 1 in 41 from Cowlairs mostly in tunnel. Cowlairs tunnel is 1000 yards (914 m) in length. There were other major structures on the line: the Garngaber Viaduct carried the line over Bothlin Burn and the Monkland and Kirkintilloch Railway; Castlecary Viaduct consists of 8 arches and is 200 yards long. The Falkirk (or Callendar) tunnel is 845 yards long. Approaching Linlithgow the Avon Viaduct consists of 23 arches; Winchburgh tunnel is 372 yards in length; and the Almond Valley Viaduct has 36 arches; it cost £130,000 to build. The permanent way consisted of malleable iron rails on stone blocks; the form of construction was already obsolete; "half logs" were used in some places.[10][page needed] The construction of the E&GR line to the Haymarket terminal in Edinburgh cost £1,200,000 for 46 miles (74 km). The 30 miles (48 km) of the Liverpool and Manchester had cost £1,407,000. OpeningA ceremonial opening of the line took place on 19 February 1842 and the Edinburgh and Glasgow Railway opened for passenger traffic on 21 February 1842, between its Glasgow station (sometimes referred to at first as Dundas Street, and later named Queen Street) and Edinburgh, where the station was at Haymarket, at the western edge of the New Town.[1][11][page needed] It was Scotland's first trunk line.[12][page needed] Goods traffic started in March 1842.[13][page needed] There were four passenger trains each way daily; and there were ten intermediate stations and the journey took 150 minutes. Two passenger trains ran each way on Sundays, "timed at hours which would not interfere with the ordinary period of divine service". This provoked great controversy as the observance of the Sabbath was held as sacred by much of Scottish public opinion at the time. Edinburgh time was observed, 4.5 minutes later than Glasgow time. The intermediate stations were at Corstorphine (later Saughton), Gogar, Ratho, Winchburgh, Linlithgow, Polmont, Falkirk, Castlecary, Croy, Kirkintilloch (later Lenzie) and Bishopbriggs. There was a ticket platform at Cowlairs.[note 1][7][page needed][14][page needed][13][page needed] The opening created phenomenal passenger demand, three times what was expected, and by 1850 company needed 58 locomotives and 216 coaches to handle the traffic. The quantity of passenger business on the line considerably exceeded the estimates, reaching almost double the daily volume; third class travel was especially buoyant, although in the first years third class passengers did not have seating accommodation, and even second class carriages did not have glazed windows. Goods traffic started in March 1842 and slowly increased, overtaking passenger traffic in revenue terms by 1855.[1][page needed] In the years 1845 – 1846, Alexander Bain installed an electric telegraph system along the line; the cost to him was £50 per mile.[10][page needed] Cowlairs inclineThe incline section was worked by stationary engine and cable haulage: an 80 hp (60 kW) high pressure steam engine was constructed at Cowlairs, and a continuous hemp rope was used to pull trains up the gradients. Special brake vehicles were attached to downwards trains to control the descent. There was soon difficulty with the hemp rope slipping in damp weather, and two banking engines[note 2] named Samson and Hercules, were introduced in 1844, but they were found to be damaging to the track, and the powerful exhaust caused vibrations in the roof, leading to leakage of the canal water. The banking engines were sent to the Monklands area in 1848, and wire rope haulage with the stationary engine was used instead.[12][page needed] The endless rope for the incline was driven by two beam engines at Cowlairs, of the high pressure type, made by Kerr, Neilson and Company of Glasgow. They had 28 inch cylinders, and 72 inch stroke. The crankshaft had a spur wheel of 12 feet diameter, which drove the cable drum through gearing. The main cable drum was 18 feet in diameter, mounted in a pit under the track. The beam engines were supplied with steam at 50 psi by 8 boilers, each 30 feet long and 5 feet diameter.[15][page needed][16] The boilers were replaced in 1862 – 1863 by seven Cornish boilers.[15][page needed] The cable haulage continued in operation until 31 January 1908, when banking engines took over. The stationary engines at Cowlairs were scrapped the following year. An accident took place in 1869 and the Inspecting Officer's report gives a flavour of the operations on the incline:
The rear part of the train became derailed in the tunnel, and the train became divided; the front part continued and the telegraph clerk failed to satisfy himself that the whole train had arrived; later,
The passenger train collided with the derailed rear part of the trains of wagons.[17] Hamilton Ellis described the operation after the banking engines were first discontinued:
Monkland RailwaysThe coal railways of the Monkland district had been very successful early entrants in the field of conveying minerals to market, but as technological pioneers they were now at a disadvantage, with their primitive track and a track gauge that was now non-standard, preventing through running. They worked together in a loose collaboration. In 1844 the E&GR agreed a takeover with them, and from the first day of 1846 took on the operation of their lines, while Parliamentary permission for formal takeover was sought. On 3 July 1846 this was refused by Parliament, and the E&GR withdrew from the informal arrangement at the end of 1846. At this time the Caledonian Railway was planning its route linking Glasgow, and the Caledonian concluded an agreement to take over the Garnkirk and Glasgow Railway and the Wishaw and Coltness Railway. The other coal railways aligned themselves away from the Caledonian Railway's influence, and in 1848 they merged to form the Monkland Railways.[1][page needed] Extending to WaverleyThe Haymarket terminal was at the western extremity of Edinburgh and inconveniently located, and an Act was obtained on 4 July 1844 to extend the line to a more central location.[7][page needed][11][page needed] The North British Railway was building its main line from North Bridge station to Berwick-upon-Tweed,[note 3] there to connect with the Newcastle and Berwick Railway (later to form the York, Newcastle and Berwick Railway).[13][page needed] The E&GR extended their line eastwards from Haymarket to their own station at North Bridge immediately adjacent to the NBR station. The line opened for passenger traffic on 1 August 1846.[13][page needed][14][page needed][15][page needed][18][page needed] The NBR had started operations on 22 June 1846. By then the North British Railway had commenced their passenger service, on 17 June.[1][page needed][11][page needed][13][page needed][note 4] For a time the two stations were separate, and with separate goods stations in addition. The primitive passenger accommodation at first was only temporary: from 3 August 1846 E&GR passengers were accommodated at a single platform partly under the northernmost of the Waverley Bridge's three wide arches." On 17 May 1847 the permanent joint passenger station came into use. The North British Railway referred to it simply as "Edinburgh" station, or "North Bridge", although it was also known as the General station.[15][page needed] On the same day the Edinburgh Leith and Granton Railway (formerly the Edinburgh, Leith and Newhaven Railway) opened its line from Scotland Street to Canal Street station, adjacent to the new Edinburgh station and at right angles to the other routes. There was a siding connection to the E&GR line.[11][page needed] The E&GR and NBR joint station was formally inaugurated on 22 February 1848. The accommodation at the station was clearly cramped, largely due to the built up surroundings limiting available land. Extension was under way in subsequent years but in 1852 a financial crisis within the North British Railway called a halt to the work and the original single platform under North Bridge was brought back into use.[11][page needed] Parallel routesStage coach operation on the route of the E&GR fought a brave but futile rearguard action, but the Union Canal and the Forth and Clyde Canal continued to trade in goods and especially mineral traffic, although they lost nearly all of their passenger business. In 1845 there was a frenzy of railway promotion in Scotland, and the Caledonian Railway, among many others, was authorised by Act of Parliament; its capitalisation was £1,500,000, to build a line from Glasgow and Edinburgh to Carlisle, linking there with English railways. Well before its Act, the Caledonian had set about capturing as many other railways, whether completed or still only proposals, as it could. It did so by concluding leases of those lines; the advantage of that was that the lease charge payments only became due later, and were annual percentages: no large front-end payment was necessary. The Caledonian would soon have its own line, albeit somewhat longer than the E&GR, between Glasgow and Edinburgh, and its predatory behaviour led to alarm in the E&GR board room that further Caledonian acquisitions and leases would result in serious harm to the E&GR. Accordingly, the board proposed an amalgamation with the Monkland Railways, the Wilsontown, Morningside and Coltness Railway[note 5] and the Scottish Central Railway, and the Forth and Clyde Canal, the Union Canal and the Monkland Canal. (The canals still carried substantial mineral traffic.) That group of companies worked as a voluntary combination for a few months under Bryan Padgett Gregson, an experienced manager of canals and railways from Lancashire. In late 1846 the Lancashire shareholders, insensitive to the fear of Caledonian hegemony and reluctant to spend money acquiring canals, which they considered to be beaten competitors, overturned the arrangement, and Gregson was dismissed. (In 1849 the E&GR purchased the Union Canal for £209,000, still against the opposition of the Lancashire shareholders.) On 1 April 1848 the Caledonian Railway opened its line between Edinburgh and Glasgow. It was difficult in operational terms, but in July the Caledonian accelerated its passenger trains and added new fast services, and cheap fares. The E&GR responded with fare reductions, and a desperate price war soon developed. It could not continue and in September fares were increased by mutual agreement.[note 6][1][page needed] Shieldhill branchThe Edinburgh and Glasgow Railway opened its Shieldhill branch on 28 August 1847. This ran from the Slamannan Railway at Causewayend, heading westward to Blackbraes. There was already a considerable network of mineral tramways in the area, leading to the Union Canal, serving pits and tile works.[1][page needed] The Wilsontown, Morningside and Coltness RailwayThe Wilsontown, Morningside and Coltness Railway (WM&CR) was another of the "coal railways" serving mineral sites in Lanarkshire. It opened in 1845, and ran from a junction with the Wishaw and Coltness Railway at Morningside, to Longridge. The Board of Trade Inspecting Officer commented about the Longridge terminus: "The line terminates in a large field, about a mile from a small village called Whitburn".[19][page needed] Although the line connected a number of pits, it was dependent on a long haul to Coatbridge, handing over to the W&C railway at Morningside, and the line was not commercially successful. Raising money to continue eastwards to a more lucrative destination proved beyond the resources of the company. In 1847 the company decided that it could not continue independently, and the negotiated the sale of their line to the Edinburgh and Glasgow Railway. A legal prohibition on amalgamation of companies which had not expended half of their authorised capital delayed the process until 1849, when an Act was obtained, authorising the sale to the E&GR, which took full effect in 1850. In the hiatus period, and with the authorisation of the Edinburgh and Bathgate Railway, the WM&CR enlisted E&GR financial help and set about extending from Longridge to Bathgate. The E&GR wished to exclude the Caledonian Railway from the area. The line opened to goods and mineral traffic early in 1850, and passenger traffic started in May 1850, after the takeover by the E&GR. Stirling and Dunfermline RailwayThe Stirling and Dunfermline Railway was authorised on 16 July 1846. As well as linking the named places, there were to be branches to Alloa and Tillicoultry. The line opened between Dunfermline and Alloa on 28 August 1850, and Alloa Harbour and Tillicoultry were connected on 3 June 1851. The section from Alloa to Stirling was completed on 1 July 1852. At Dunfermline, the line made an end-on connection with the Edinburgh, Perth and Dundee Railway, giving onward connection to Fife. The company was vested in the Edinburgh and Glasgow Railway by Act of 28 June 1858.[20][page needed] The Stirlingshire Midland Junction RailwayWhen the Caledonian Railway opened its line throughout in 1848, it had a connection to Greenhill, joining the E&GR and the Scottish Central Railway there. The SCR gave access to Stirling and Perth and was an important connecting route. Moreover, the Caledonian and the SCR concluded a working arrangement which they expected to lead to formal merger. The E&GR needed to ensure that it got access to the Stirling and Perth line from the Edinburgh direction, and to do so it sponsored the Stirlingshire Midland Junction Railway. The nominally independent company got its authorising Act of Parliament on 16 July 1846, to build a line from Polmont (on the E&GR) through Grahamston (part of Falkirk), crossing the Forth and Clyde Canal and turning north to join the SCR near Larbert. Its capital was £450,000, and branches were authorised to Carron Ironworks and to Falkirk Ironworks.[1][page needed][2][page needed] The company's authorising act empowered sale to the Edinburgh and Glasgow Railway, and this was done on 1 October 1850, before the line opened.[20][page needed] The Campsie branchOn 5 July 1848 the E&GR opened the Campsie branch. This left the E&GR main line east of Lenzie, and dropped down into the Kelvin Valley, running through Kirkintilloch, where it had a station separate from the Monkland and Kirkintilloch Railway station. The line continued from there through Milton of Campsie to Lennoxtown.[1][page needed][10][page needed] The Edinburgh and Bathgate RailwayBathgate was an important manufacturing town and on 12 November 1849 the Edinburgh and Bathgate Railway was opened, from a junction with the E&GR at Ratho. The line was worked by the E&GR.[1][page needed] The Glasgow, Dumbarton and Helensburgh RailwayThe Glasgow, Dumbarton and Helensburgh Railway was opened on 28 May 1858 from a junction at Cowlairs. The line was worked by the E&GR, and goods traffic was handled at the E&GR Sighthill yard; Queens Street was used for passengers. There was a last minute disagreement between the two companies, and at first the trains from Helensburgh ran to Buchanan Street via Sighthill, reversing on to the Caledonian Railway line. The disagreement was resolved and the intended use of E&GR facilities took effect from 30 June 1858. The Alva RailwayThe Alva Railway was vested on 22 July 1861 and was opened from Alva to Cambus, on the Stirling and Dunfermline line, on 11 June 1863. It was vested in the Edinburgh and Glasgow Railway on 31 July 1864.[20][page needed] GrangemouthThe Forth and Clyde Canal entered the Firth of Forth at Grangemouth, and a considerable harbour had been built up there. Grangemouth was only three miles from the E&G's Polmont to Grahamston line, and a branch railway was an obvious move. The Forth and Clyde Canal company built the line, from Grahamston. It opened in 1860 for goods traffic, and in 1861 for passengers. It was a single line and it was worked by the E&GR. In 1867 the Caledonian Railway acquired the canal, and in doing so acquired the railway branch too. By now the North British Railway had absorbed the E&GR, and the Grangemouth line was deep inside the territory the NBR considered its own. The NBR was given running powers over the line, giving access to the harbour. The Caledonian went to considerable lengths to improve the harbour (and the canal generally). The volume of rail traffic increased over time as Grangemouth became the dominant port, and a second route into Grangemouth, diverging from the Grahamston line west of Falkirk, was opened in 1908, both the NBR and the Caledonian having constructed their section, joining at the swing bridge over the canal.[1][page needed] Alliances, and a mergerOn 28 January 1862 the E&GR and the Caledonian Railway signed the Thirty Years Agreement, in which traffic and receipts on a number of routes were shared by a pre-arranged formula.[note 7] This resulted in North British Railway transfer traffic to Glasgow being charged very high rates, and Hodgson, Chairman of the NBR, determined to get control of the E&GR. In 1864 the Great Northern Railway and the North Eastern Railway suggested to Hodgson, that the three companies should jointly lease the E&GR, forming an East Coast route into Glasgow, but it proved impossible to negotiate a deal. Hodgson prepared a scheme for a Glasgow and North British Railway, which would build an entirely new route to Glasgow. Alarmed, the E&GR immediately reduced its rates to Glasgow, which broke its agreement with the Caledonian. On 23 June 1864 the E&GR announced a change of policy and an end to the Thirty Years Agreement, and "an agreement of a permanent nature with the North British Company". The E&GR had long been harbouring a plan to absorb the Monkland Railways, which had an extensive network in central Scotland mainly devoted to mineral sites. The proposal came to fruition on 31 July 1865, when the Monkland Railways were absorbed by the E&GR.[1][page needed] Absorbed by the North British RailwayThe following day, on 1 August 1865, the North British Railway absorbed the E&GR, and with it the Monkland Railways.[21][page needed] The Locomotive Superintendent of the NBR made a tour of inspection of E&GR and Monkland Railways depots and found the rolling stock in an extremely poor state, badly under-reported in official returns. The E&GR Cowlairs workshops were far superior to the NBR St Margarets, and they became the principal depot for the combined company.[21][page needed] Developments under the North BritishNow part of the North British Railway network, the E&GR line formed the trunk of the westward routes from Edinburgh. In 1872 a siding connection was provided near Lenzie for the construction of a mental hospital, at the time known as Woodilee Lunatic Asylum. The hospital itself opened in 1875. The siding was removed in 1963 after a period of disuse.[10][page needed] The Glasgow Queen Street station was very cramped, and included a goods station. More branch services were terminating at the station, and in 1877 the North British Railway opened up the mouth of the tunnel and widened the station throat, and provided six platforms. (It had been built with a single arrival platform and a single departure platform, with three carriage stabling sidings between, and a goods station on the east side next to North Hanover Street.) The ascent of the Cowlairs incline continued to be a difficulty, and electric traction was proposed, but not proceeded with. From August 1909 steam traction with banking assistance handled everything; the cable haulage was discontinued.[12][page needed] Traffic to Stirling and beyond had used the route to Polmont and Carmuirs, joining the Scottish Central Railway there, although the Edinburgh and Northern Railway route, involving two ferry crossings was available from 1847, and the NBR opened a route from Ratho to South Queensferry in 1866, enabling a crossing of the Firth of Forth by ferry there. The northwards routes were greatly simplified when the Forth Bridge was opened in 1890. A more direct route from Edinburgh to Dalmeny, at the south end of the bridge, was provided as part of the work; it left the E&GR main line at Saughton. The intervening terrain between Edinburgh and Glasgow, served largely by the former Monkland Railways lines, but also by several mineral branches of the E&GR main line, was mostly given over to coal and iron pits, and ironworks. While some extensions were constructed to serve new or expanded pits, the best times for the industries in the area had gone, and decline over several decades set in. As the industrial sites closed, so did the railway connections. In greater Glasgow, the North British Railway very gradually built up a suburban passenger network, and served industrial sites on the north bank of the River Clyde west of Glasgow. The great improvement took place when Airdrie and Coatbridge were connected directly to Glasgow in 1870. These developments put increasing pressure on the Queen Street terminus, which was still very cramped. This was finally resolved when the Glasgow City and District Railway was opened in 1896, allowing trains to run through Glasgow without entering a terminus station. The twentieth centuryIn 1902 a branch line was opened to Corstorphine, serving a growing residential suburb of Edinburgh. At the "grouping" of the railways, the North British Railway was a constituent of the new London and North Eastern Railway (LNER) in 1923, following the Railways Act 1921. In turn the LNER was nationalised as part of British Railways, Scottish Region in 1948. The direct line through Falkirk High was closed between 9 March 1980 and 8 December 1980 for tunnel repairs and the installation of slab track; for the time being through trains ran via Grahamston. DieselisationFrom 7 January 1957, Swindon-built inter-city diesel multiple units were introduced; running in six car formations, they operated the fast trains between Edinburgh and Glasgow. The new trains were a considerable success, and the unit formation avoided the engine run-round and disposal moves at each end of the journey, which was especially useful at Glasgow because of the tunnel constraint. The journey time was 55 minutes. Although the new trains were a considerable advance over what had gone before, by the end of the 1960s they were perceived as inadequate, and trials were undertaken with a class 37 locomotive in push and pull mode; but this was not considered successful and pairs of class 27 locomotives were used instead, with mark II coaches. One locomotive was marshalled at each end of the train. This system was introduced from 3 May 1971, and reduced the journey time to 43 minutes. After some years the class 27 locomotives were suffering persistent failures due to the heavy use, and new arrangements were put in hand from 1979 using single class 47/7 locomotives, specially converted from class 47/4. A driving trailer (DBSO) was used at the remote end of the train, and control was effected through the lighting circuits. The maximum speed was 95 mph (153 km/h). The full service on this arrangement started in December 1980. The next generation was class 158 diesel multiple units, which were introduced in 1990, making the journey in 50 minutes with three stops.[1][page needed][10][page needed][13][page needed] The present dayThe original main line between Edinburgh and Glasgow is in operation, with a frequent fast passenger train service between the two cities. The route via Grahamston is also in use. The Edinburgh and Bathgate line was closed to passengers in 1956 but has reopened as part of an electrified route between Edinburgh and Glasgow via Bathgate and Airdrie. The other sections of line built by the Edinburgh and Glasgow Railway have closed. Early trial of electric tractionRobert Davidson was a resident of Aberdeen, living 1804 to 1894. He became interested in electromagnetism, and he designed a four-wheeled car that used his batteries and a rudimentary electric motor. He approached the directors of the Edinburgh and Glasgow Railway suggesting a railway trial, having built a full size locomotive 16 feet long, powered by his batteries. It was run on a section of the Edinburgh to Glasgow line in 1842 and was thus the world's first electrically powered railway locomotive. It only managed to achieve a speed of 4 mph and as the batteries were not rechargeable its practicality was doubtful. The E&GR directors were not sufficiently impressed to take the concept further. The locomotive was reported as being destroyed whilst stored in the engine house at Perth.[22] TopographyEdinburgh Waverley to Haymarket was opened on 1 August 1846. Locations on the original E&GR main line, opened 21 February 1842, were:
Locations on the Polmont to Carmuirs line, opened 1 October 1850, were:
Almond Valley Viaduct is the longest structure on the E&GR main line; it was constructed in a 20-month period. It is in two sections separated by a high embankment about a quarter mile in length. The eastern section consists of 36 ashlar-faced segmental arches of 50 feet span, and the line is on a sweeping curve of about 2,500 yards radius. The spandrels have been strengthened by steel spandrel ties. The western section is of 7 arches, and the centre span bridges the Edinburgh to Bathgate road. This arch of 66 feet span has been badly affected by subsidence in connection with shale extraction. The contractor for the construction was John Gibb. The contract included Winchburgh tunnel and cutting, and he lost £40,000 on the estimate as his calculation contained an error; he discovered this before his tender was accepted, but he felt an obligation to honour the tender offer.[9][page needed] Winchburgh Tunnel is 367 yards long. It took 24 months to construct. Firedamp was a problem in the construction and a workman was badly burned. The Myers Burn west of the tunnel passes under the line in twin inverted siphons.[9][page needed] Cowlairs tunnel is actually in three parts, Bell's Park (272 yards), Asylum (292 yards) and Broomhill (476 yards).[9][page needed] Accidents